Orbital Disposal & ODAR Readiness
Pre-CDR spacecraft readiness combines Batch 5's live regulatory verdicts with Batch 9's engineering mechanics: FCC 47 CFR § 25.283(e) 5-year LEO disposal, NASA-STD-8719.14C ODAR/EOMP contract deliverables, stored-energy passivation, and reentry casualty limits.
Primary Authority / Source: FCC (47 CFR 25.283(e)) / NASA ODPO | As-Of / Horizon: 2026-11-16

Readiness Checklist & Corpus Traceability
- Lock 5-Year Post-EOM Decay/Deorbit: Size orbit altitude or propulsion to clear LEO (<2,000 km) within 5 years per FCC 5-Year Deorbit (LIVE) and FCC 5-Year Rule Mechanics.
- Deliver ODAR & EOMP at PDR/CDR: Run NASA DAS / ORSAT as contract deliverables (not federal regulations) per NASA ODAR Contract Deliverable and NASA ODAR Rule Status.
- Verify Stored-Energy Passivation: Design battery, pressure-vessel, and propellant venting for
<0.001explosion probability per Spacecraft Passivation. - Model Reentry Casualty Risk (<1:10,000): Validate >15 J fragment demisability or controlled SPOUA reentry per Casualty Risk & Demisability.
- Protect EOL Propellant Margin: Ring-fence deorbit delta-v reserves and solar-cycle drag assumptions per EOL Propellant Margin and Solar-Cycle Drag Limits.
Mission Designer Disposal & ODAR Checklist
| Gate / Metric | Required Threshold | Corpus Source |
|---|---|---|
| 47 CFR 25.283(e) | LEO (<2,000 km) disposal <= 5 yrs post-EOM | #2304 FCC 5-Yr |
| NASA-STD-8719.14C | PDR/CDR ODAR & EOMP via DAS/ORSAT | #2307 NASA ODAR |
| Passivation | Explosion probability < 0.001 at EOM | #2310 Passivation |
| Casualty Risk (Ec) | < 1:10,000 for uncontrolled reentry | #2313 Demisability |
| Master EOL Check | Full spacecraft/prime flow-down sign-off | #2367 EOL Checklist |
Operator Execution & Boundary Notes
- Assign ownership to the Program Manager (Program: FAA, NEPA, FCC & ODAR) and check prime flow-downs (FCC 5-Yr EPD Flowdown).
- Do not treat
NASA-STD-8719.14Cas a federal statute—it binds via NASA/DoD contract deliverables. - Run solar-cycle sensitivity checks on passive-decay orbits above ~500 km before freezing bus mass.
Connected Corpus Source Pieces
- FCC 5-Year Rule Mechanics
- NASA ODAR Contract Deliverable
- Spacecraft & Upper-Stage Passivation
- Reentry Casualty Risk & Demisability
- Mission Designer EOL Checklist