Distinguishes demonstrated 2025 missions (Otter Pup 2, Remora) from 2026–2027 planned full-scale Otter missions as of 2026-11-16.
ORBITAL SUSTAINABILITY · WA SERVICING & HABITATS · OPERATOR RELEASES & AGENCY CONTRACTS
Starfish Space Otter Servicing Record
Tukwila-based Starfish Space demonstrated autonomous rendezvous and proximity operations (RPO) on Otter Pup 2 (launched June 23, 2025) and Remora (December 2025) and raised $100M+ Series B in April 2026—while its full-scale Otter commercial/SDA/NASA servicing missions remain 2026–2027 roadmap deployments.
Primary Authority / Source: Starfish Space / NASA / USSF SDA | As-Of / Horizon: As of Nov 2026 (Otter Pup 2 Jun 2025; Remora Dec 2025)

Documented Instrument & Engineering Record
- Demonstrated record (not roadmap): Otter Pup 2 launched June 23, 2025 aboard SpaceX Transporter-14 to attempt docking with an unprepared D-Orbit ION satellite; in December 2025, Starfish and Impulse Space completed the Remora autonomous single-camera RPO mission in LEO.
- Roadmap boundary (planned, not yet accomplished): Full-scale Otter servicing vehicles—supporting U.S. Space Force Space Development Agency (SDA) end-of-life constellation disposal, NASA, and commercial GEO operators (SES/Intelsat)—are contracted roadmap missions slated for 2026–2027.
- Capture mechanism: Starfish's Nautilus capture mechanism targets unprepared client satellites without requiring pre-installed docking rings or refueling ports.
- WA footprint: Headquartered and manufacturing in Tukwila, WA (665 Andover Park W), backed by a $100M+ Series B announced in April 2026.
Starfish Space: Demonstrated Flight Record vs. Contracted Roadmap
| Program / Mission | Status (Nov 2026) | Mission Scope |
|---|---|---|
| Otter Pup 1 (2023) | Demonstrated (with anomalies) | Initial RPO & docking pathfinder |
| Otter Pup 2 (Jun 2025) | Demonstrated (Launched) | LEO RPO & unprepared D-Orbit ION docking test |
| Remora (Dec 2025) | Demonstrated (Completed) | Autonomous closed-loop RPO w/ Impulse Space |
| Full-Scale Otter (SDA/NASA/SES) | Planned Roadmap (2026–2027) | End-of-life disposal & GEO life extension |
Mission Designer, Compliance Lead & Founder Takeaways
- Compliance teams evaluating Starfish Space for backup deorbit coverage must distinguish demonstrated RPO software from yet-to-fly full-scale Otter vehicles.
- FCC 5-year disposal rules create direct commercial demand for third-party tug/disposal contracts when a constellation satellite loses propulsion before EOL.
- Link servicing vendor contracts carefully to FCC ODMP contingency plans—a servicing agreement does not automatically waive primary spacecraft passivation.
Connected Census Profiles, Segments & Rules
- Starfish Space (Tukwila) Census Profile
- In-Space Servicing Segment Overview
- In-Space Servicing RPO & Habitats
