Mission Designer’s End-of-Life Compliance Checklist: FCC, NASA ODAR, FAA Part 450 & WA Servicing

Engineers inspecting a modular satellite bus inside a Pacific Northwest aerospace cleanroom

Synthesizes FCC, NASA, FAA, and NOAA requirements verified as of 2026-11-16.

ORBITAL SUSTAINABILITY · MEASUREMENT & ESG GAP · UNIFIED BINDING INSTRUMENTS (NOV 2026)
Mission Designer EOL Compliance Checklist
A unified end-of-life engineering and licensing checklist for mission designers, compliance leads, and founders—mapping every spacecraft gate across FCC 47 CFR § 25.283(e), NASA-STD-8719.14C ODARs, FAA Part 450, NOAA Part 960, and WA servicing contingencies.
Primary Authority / Source: FCC / NASA / FAA / NOAA  |  As-Of / Horizon: As of Nov 2026
ORBITAL SUSTAINABILITY · PDF & MARKDOWN TWIN
Mission Designer EOL Compliance Checklist — Reference Brief
Download the 2-page printable reference PDF or read the clean Markdown twin for AI and briefing workflows.
Mission Designer End-of-Life (EOL) Compliance Checklist
Mission Designer End-of-Life (EOL) Compliance Checklist

Documented Instrument & Engineering Record

  • Gate 1 (PDR — Orbit & Propellant): Confirm whether deployment altitude decays passively in <= 5 years under conservative solar flux, or lock in dedicated EOL deorbit delta-v + tank-gauging margin.
  • Gate 2 (CDR — Passivation): Design latch-open propellant/pressurant vents and permanent battery-to-array disconnect relays to keep accidental breakup probability < 0.001.
  • Gate 3 (CDR/FRR — Demisability): Run DAS and ORSAT on all dense components (titanium, steel, optics) to verify Ec < 1:10,000 for > 15 J fragments—or budget controlled SPOUA reentry.
  • Gate 4 (Licensing — Multi-Agency): Align FCC Part 25 ODMP, NASA contract ODAR/EOMP (if NASA-funded/hosted), FAA Part 450 upper-stage COLA, and NOAA Part 960 (if Earth-observing).

End-of-Life Compliance Checklist by Mission Phase

PhaseRequired Engineering / Filing ActionBinding Instrument
Preliminary Design (PDR)5-yr decay / EOL propellant & Preliminary ODARFCC § 25.283(e) / NPR 8715.6B
Critical Design (CDR)Passivation hardware + ORSAT demisability runNASA-STD-8719.14C
Pre-Launch LicensingFile FCC ODMP + NOAA Part 960 + FAA Part 45047 CFR 25 / 15 CFR 960 / 14 CFR 450
End of Mission (EOM)Deorbit burn before COLA loss + vent/dischargeFCC ODMP / EOMP

Mission Designer, Compliance Lead & Founder Takeaways

  • Keep one single source of truth for component masses, materials, and tank volumes across FCC ODMP and NASA ODAR submissions.
  • Treat WA servicing providers (Starfish Space Otter) and OTVs (Portal Space Supernova) as contingency/roadmap options—never as an excuse to skip onboard passivation.
  • For corporate ESG inquiries, pair terrestrial GHG Protocol Scope 1–3 disclosures with this licensing checklist while noting no space-specific ESG standard exists.

Connected Census Profiles, Segments & Rules

Primary Sources & Official Records

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence