# Mission Designer's End-of-Life Compliance Checklist: FCC, NASA ODAR, FAA Part 450 & WA Servicing

*Synthesizes FCC, NASA, FAA, and NOAA requirements verified as of 2026-11-16.*

- **Section:** Orbital Sustainability (Measurement & ESG Gap)
- **Evidence Basis:** Unified Binding Instruments (Nov 2026)
- **Primary Authority / Source:** FCC / NASA / FAA / NOAA
- **As-Of / Horizon:** As of Nov 2026
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-eol-design-checklist-wa.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-eol-design-checklist-wa-infographic.png)

> A unified end-of-life engineering and licensing checklist for mission designers, compliance leads, and founders—mapping every spacecraft gate across FCC 47 CFR § 25.283(e), NASA-STD-8719.14C ODARs, FAA Part 450, NOAA Part 960, and WA servicing contingencies.

## Documented Instrument & Engineering Record

- Gate 1 (PDR — Orbit & Propellant): Confirm whether deployment altitude decays passively in <= 5 years under conservative solar flux, or lock in dedicated EOL deorbit delta-v + tank-gauging margin.
- Gate 2 (CDR — Passivation): Design latch-open propellant/pressurant vents and permanent battery-to-array disconnect relays to keep accidental breakup probability < 0.001.
- Gate 3 (CDR/FRR — Demisability): Run DAS and ORSAT on all dense components (titanium, steel, optics) to verify Ec < 1:10,000 for > 15 J fragments—or budget controlled SPOUA reentry.
- Gate 4 (Licensing — Multi-Agency): Align FCC Part 25 ODMP, NASA contract ODAR/EOMP (if NASA-funded/hosted), FAA Part 450 upper-stage COLA, and NOAA Part 960 (if Earth-observing).

## End-of-Life Compliance Checklist by Mission Phase

| Phase | Required Engineering / Filing Action | Binding Instrument |
| :--- | :--- | :--- |
| Preliminary Design (PDR) | 5-yr decay / EOL propellant & Preliminary ODAR | FCC § 25.283(e) / NPR 8715.6B |
| Critical Design (CDR) | Passivation hardware + ORSAT demisability run | NASA-STD-8719.14C |
| Pre-Launch Licensing | File FCC ODMP + NOAA Part 960 + FAA Part 450 | 47 CFR 25 / 15 CFR 960 / 14 CFR 450 |
| End of Mission (EOM) | Deorbit burn before COLA loss + vent/discharge | FCC ODMP / EOMP |

## Mission Designer, Compliance Lead & Founder Takeaways

- Keep one single source of truth for component masses, materials, and tank volumes across FCC ODMP and NASA ODAR submissions.
- Treat WA servicing providers (Starfish Space Otter) and OTVs (Portal Space Supernova) as contingency/roadmap options—never as an excuse to skip onboard passivation.
- For corporate ESG inquiries, pair terrestrial GHG Protocol Scope 1–3 disclosures with this licensing checklist while noting no space-specific ESG standard exists.

## Connected Census Profiles, Segments & Rules

- [WA Space Cluster Hub](https://bcesg.org/washington-space-cluster-census/)
- [FCC 5-Year Disposal Rule Mechanics](https://bcesg.org/wa-space-orbital-fcc-5-year-rule-mechanics/)
- [NASA ODAR Contract Deliverable Guide](https://bcesg.org/wa-space-orbital-nasa-odar-contract-deliverable/)
- [No Space-Specific Scope 3 / ESG Standard Gap](https://bcesg.org/wa-space-orbital-no-scope-3-esg-standard-gap/)

## Primary Sources & Official Records

- [eCFR: 47 CFR § 25.283](https://www.ecfr.gov/current/title-47/chapter-I/subchapter-B/part-25/subpart-D/section-25.283)
- [NASA Standards: NASA-STD-8719.14](https://standards.nasa.gov/standard/nasa/nasa-std-871914)
- [eCFR: 14 CFR Part 450](https://www.ecfr.gov/current/title-14/chapter-III/subchapter-C/part-450)
