Starfish Space (Tukwila): Otter & Otter Pup 2 / Remora Demonstrated RPO vs. Roadmap

Pacific Northwest river valley industrial logistics corridor with freight rail and aerospace warehouses

Distinguishes demonstrated 2025 missions (Otter Pup 2, Remora) from 2026–2027 planned full-scale Otter missions as of 2026-11-16.

ORBITAL SUSTAINABILITY · WA SERVICING & HABITATS · OPERATOR RELEASES & AGENCY CONTRACTS
Starfish Space Otter Servicing Record
Tukwila-based Starfish Space demonstrated autonomous rendezvous and proximity operations (RPO) on Otter Pup 2 (launched June 23, 2025) and Remora (December 2025) and raised $100M+ Series B in April 2026—while its full-scale Otter commercial/SDA/NASA servicing missions remain 2026–2027 roadmap deployments.
Primary Authority / Source: Starfish Space / NASA / USSF SDA  |  As-Of / Horizon: As of Nov 2026 (Otter Pup 2 Jun 2025; Remora Dec 2025)
ORBITAL SUSTAINABILITY · PDF & MARKDOWN TWIN
Starfish Space Otter Servicing Record — Reference Brief
Download the 2-page printable reference PDF or read the clean Markdown twin for AI and briefing workflows.
Starfish Space (Tukwila): Demonstrated Missions vs. Otter Roadmap
Starfish Space (Tukwila): Demonstrated Missions vs. Otter Roadmap

Documented Instrument & Engineering Record

  • Demonstrated record (not roadmap): Otter Pup 2 launched June 23, 2025 aboard SpaceX Transporter-14 to attempt docking with an unprepared D-Orbit ION satellite; in December 2025, Starfish and Impulse Space completed the Remora autonomous single-camera RPO mission in LEO.
  • Roadmap boundary (planned, not yet accomplished): Full-scale Otter servicing vehicles—supporting U.S. Space Force Space Development Agency (SDA) end-of-life constellation disposal, NASA, and commercial GEO operators (SES/Intelsat)—are contracted roadmap missions slated for 2026–2027.
  • Capture mechanism: Starfish's Nautilus capture mechanism targets unprepared client satellites without requiring pre-installed docking rings or refueling ports.
  • WA footprint: Headquartered and manufacturing in Tukwila, WA (665 Andover Park W), backed by a $100M+ Series B announced in April 2026.

Starfish Space: Demonstrated Flight Record vs. Contracted Roadmap

Program / MissionStatus (Nov 2026)Mission Scope
Otter Pup 1 (2023)Demonstrated (with anomalies)Initial RPO & docking pathfinder
Otter Pup 2 (Jun 2025)Demonstrated (Launched)LEO RPO & unprepared D-Orbit ION docking test
Remora (Dec 2025)Demonstrated (Completed)Autonomous closed-loop RPO w/ Impulse Space
Full-Scale Otter (SDA/NASA/SES)Planned Roadmap (2026–2027)End-of-life disposal & GEO life extension

Mission Designer, Compliance Lead & Founder Takeaways

  • Compliance teams evaluating Starfish Space for backup deorbit coverage must distinguish demonstrated RPO software from yet-to-fly full-scale Otter vehicles.
  • FCC 5-year disposal rules create direct commercial demand for third-party tug/disposal contracts when a constellation satellite loses propulsion before EOL.
  • Link servicing vendor contracts carefully to FCC ODMP contingency plans—a servicing agreement does not automatically waive primary spacecraft passivation.

Connected Census Profiles, Segments & Rules

Primary Sources & Official Records

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence