Green River Valley Floodplain Continuity & 72-Hour Readiness Checklist

Pacific Northwest river valley industrial logistics corridor with freight rail and aerospace warehouses

Synthesized from BC ESG Batch 7 (#2104–#2221) and Batch 5 (#1993). Uses exact 2009 26-mile KCFCD and 2031 repair dates.

READINESS · VALLEY & ORBITAL READINESS · BATCH 7 VALLEY & FLOODPLAIN RECORD
Valley Floodplain Continuity
Space plants in Kent, Auburn, Renton, and Tukwila sit inside a documented floodplain where King County estimates $46M/day in disruption, Dec 2025 saw Desimone and White River breaches, and full Desimone levee repairs extend to 2031.
Primary Authority / Source: KCFCD / USACE (Howard A. Hanson Dam)  |  As-Of / Horizon: 2026-11-16
READINESS · PDF & MARKDOWN TWIN
Valley Floodplain Continuity — Readiness Checklist
Download the 2-page printable readiness PDF or read the clean Markdown twin for AI and briefing workflows.
Green River Valley Continuity: Dec 2025 Breaches to 2031 Repair Horizon
Green River Valley Continuity: Dec 2025 Breaches to 2031 Repair Horizon

Readiness Checklist & Corpus Traceability

Green River Valley Continuity Readiness Matrix

Exposure / AssetReadiness ActionCorpus Source
Desimone Levee (2031)Monitor KCFCD repair milestones; stage floor kit#2137 Levee 2026-2031
Hanson Dam (2009/2025)Track USACE storage & flood-stage alerts#2113 Hanson $7.8B
Kent / Auburn / TukwilaVerify plant BFE & 72-hr ITAR custody plan#2200 72-Hr Playbook
Substation PowerConfirm backup generator fuel & UPS runtime#2134 Substation Power

Operator Execution & Boundary Notes

Connected Corpus Source Pieces

Primary Authorities & Official Records