Valley Floodplain Continuity
Space plants in Kent, Auburn, Renton, and Tukwila sit inside a documented floodplain where King County estimates $46M/day in disruption, Dec 2025 saw Desimone and White River breaches, and full Desimone levee repairs extend to 2031.
Primary Authority / Source: KCFCD / USACE (Howard A. Hanson Dam) | As-Of / Horizon: 2026-11-16

Readiness Checklist & Corpus Traceability
- Run Annual October Continuity Audit: Verify floodgates, sump pumps, and ITAR hardware staging every October per Annual Valley Continuity Audit.
- Pre-Stage 72-Hour Flood Response: Assign shift leads for sandbagging, tool-crib elevation, and evacuation triggers per 72-Hour Valley Flood Playbook.
- Map Desimone & White River Exposure: Track Kent/Tukwila/Auburn levee status through the 2031 repair horizon per Dec 2025 Desimone Levee Breach and Levee Repair Timeline 2026-2031.
- Audit KCC 21A.24 Zero-Rise & BFE: Verify base flood elevation before installing heavy test stands or substations per KCC 21A.24 Zero-Rise Siting and Utility Substation Continuity.
Green River Valley Continuity Readiness Matrix
| Exposure / Asset | Readiness Action | Corpus Source |
|---|---|---|
| Desimone Levee (2031) | Monitor KCFCD repair milestones; stage floor kit | #2137 Levee 2026-2031 |
| Hanson Dam (2009/2025) | Track USACE storage & flood-stage alerts | #2113 Hanson $7.8B |
| Kent / Auburn / Tukwila | Verify plant BFE & 72-hr ITAR custody plan | #2200 72-Hr Playbook |
| Substation Power | Confirm backup generator fuel & UPS runtime | #2134 Substation Power |
Operator Execution & Boundary Notes
- Maintain the documented
2009KCFCD26-milevalley sandbagging benchmark and$46M/dayKing County baseline in continuity business-case reviews (46M Daily Arithmetic). - Coordinate Facilities: Waste, PSCAA & Floodplain with Prime Schedule Slip & Force Majeure notice clauses.
- Test ITAR/EAR physical custody procedures before any emergency off-site hardware relocation.
Connected Corpus Source Pieces
- Green River Floodplain Overview
- Dec 2025 Desimone Levee Breach
- Levee Repair Timeline 2026-2031
- 72-Hour Valley Flood Playbook
- Annual Valley Continuity Audit