# Green River Valley Floodplain Continuity & 72-Hour Readiness Checklist

*Synthesized from BC ESG Batch 7 (#2104–#2221) and Batch 5 (#1993). Uses exact 2009 26-mile KCFCD and 2031 repair dates.*

- **Section:** Readiness (Valley & Orbital Readiness)
- **Evidence Basis:** Batch 7 Valley & Floodplain Record
- **Primary Authority / Source:** KCFCD / USACE (Howard A. Hanson Dam)
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-green-river-floodplain-continuity.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-green-river-floodplain-continuity-infographic.png)

> Space plants in Kent, Auburn, Renton, and Tukwila sit inside a documented floodplain where King County estimates $46M/day in disruption, Dec 2025 saw Desimone and White River breaches, and full Desimone levee repairs extend to 2031.

## Readiness Checklist & Corpus Traceability

- **Run Annual October Continuity Audit:** Verify floodgates, sump pumps, and ITAR hardware staging every October per [Annual Valley Continuity Audit](https://bcesg.org/wa-space-playbook-annual-valley-corridor-continuity-audit/).
- **Pre-Stage 72-Hour Flood Response:** Assign shift leads for sandbagging, tool-crib elevation, and evacuation triggers per [72-Hour Valley Flood Playbook](https://bcesg.org/wa-space-playbook-72-hour-valley-flood-levee-breach/).
- **Map Desimone & White River Exposure:** Track Kent/Tukwila/Auburn levee status through the 2031 repair horizon per [Dec 2025 Desimone Levee Breach](https://bcesg.org/wa-space-valley-dec-2025-desimone-levee-breach/) and [Levee Repair Timeline 2026-2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/).
- **Audit KCC 21A.24 Zero-Rise & BFE:** Verify base flood elevation before installing heavy test stands or substations per [KCC 21A.24 Zero-Rise Siting](https://bcesg.org/wa-space-valley-kcc-21a-24-zero-rise-bfe-siting/) and [Utility Substation Continuity](https://bcesg.org/wa-space-valley-utility-substation-power-continuity/).

## Green River Valley Continuity Readiness Matrix

| Exposure / Asset | Readiness Action | Corpus Source |
| :--- | :--- | :--- |
| Desimone Levee (2031) | Monitor KCFCD repair milestones; stage floor kit | [#2137 Levee 2026-2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/) |
| Hanson Dam (2009/2025) | Track USACE storage & flood-stage alerts | [#2113 Hanson $7.8B](https://bcesg.org/wa-space-valley-howard-hanson-dam-dec-2025-7-8b/) |
| Kent / Auburn / Tukwila | Verify plant BFE & 72-hr ITAR custody plan | [#2200 72-Hr Playbook](https://bcesg.org/wa-space-playbook-72-hour-valley-flood-levee-breach/) |
| Substation Power | Confirm backup generator fuel & UPS runtime | [#2134 Substation Power](https://bcesg.org/wa-space-valley-utility-substation-power-continuity/) |

## Operator Execution & Boundary Notes

- Maintain the documented `2009` KCFCD `26-mile` valley sandbagging benchmark and `$46M/day` King County baseline in continuity business-case reviews ([46M Daily Arithmetic](https://bcesg.org/wa-space-valley-46m-daily-floodplain-arithmetic/)).
- Coordinate [Facilities: Waste, PSCAA & Floodplain](https://bcesg.org/wa-space-role-facilities-waste-pscaa-floodplain/) with [Prime Schedule Slip & Force Majeure](https://bcesg.org/wa-space-playbook-prime-schedule-slip-force-majeure/) notice clauses.
- Test ITAR/EAR physical custody procedures before any emergency off-site hardware relocation.

## Connected Corpus Source Pieces

- [Green River Floodplain Overview](https://bcesg.org/wa-space-valley-green-river-floodplain-overview/)
- [Dec 2025 Desimone Levee Breach](https://bcesg.org/wa-space-valley-dec-2025-desimone-levee-breach/)
- [Levee Repair Timeline 2026-2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/)
- [72-Hour Valley Flood Playbook](https://bcesg.org/wa-space-playbook-72-hour-valley-flood-levee-breach/)
- [Annual Valley Continuity Audit](https://bcesg.org/wa-space-playbook-annual-valley-corridor-continuity-audit/)

## Primary Authorities & Official Records

- [King County Floodplain Rule (#1993)](https://bcesg.org/wa-space-rule-king-county-floodplain-levee-live/)
- [WSDOT Puget Sound Gateway](https://wsdot.wa.gov/construction-planning/major-projects/puget-sound-gateway-program)