December 15, 2025 Desimone Levee Breach: What Flooded, What Closed, and the 2031 Repair Horizon

Engineers inspecting a modular satellite bus inside a Pacific Northwest aerospace cleanroom

Describes only documented Dec 15, 2025 impacts; what did not flood is not implied to have flooded. Repair horizon per King County DNRP planning.

FREIGHT, RAIL & VALLEY · THE VALLEY · HISTORICAL EVENT (DATED)
Dec 2025 Desimone Levee Breach
On December 15, 2025, the Desimone Levee in Tukwila breached after a 15-foot weekly river rise, closing six miles of SR 167 and prompting evacuation orders across ~1,100 homes and businesses before same-evening temporary plugging.
Primary Agency / Source: King County DNRP / WA National Guard  |  As-Of / Horizon: 2026-11-16 (Permanent fix: 2031)
FREIGHT, RAIL & VALLEY · PDF & MARKDOWN TWIN
Dec 2025 Desimone Levee Breach — Reference Brief
Download the 2-page printable reference PDF or read the clean Markdown twin for AI and engineering workflows.
Dec 15, 2025 Desimone Levee Breach & 2031 Horizon
Dec 15, 2025 Desimone Levee Breach & 2031 Horizon

Documented Corridor Facts & Continuity Record

  • Back-to-back atmospheric rivers in mid-December 2025 drove the Green River up roughly 15 feet in a week to 60-year highs.
  • On Monday afternoon, December 15, 2025, the Desimone Levee in Tukwila breached, sending water into low-lying industrial and commercial zones spanning Tukwila, Kent, and Renton.
  • A flash flood warning affected over 45,000 people, evacuation orders covered roughly 1,100 homes and businesses, and a 6-mile stretch of SR 167 closed.
  • Emergency crews and the Washington National Guard plugged the breach with heavy rock and sandbags by the evening of December 15, allowing evacuation orders to lift.

Desimone Levee Timeline: 2020 Damage to 2031 Repair Horizon

MilestoneDate / WindowAction / ConditionSource
Prior Levee Damage2020 FloodsSustained structural damage; flagged vulnerableKing County DNRP
Levee BreachDec 15, 2025 (PM)Breach in Tukwila; 6-mi SR 167 closedKing County / WSDOT
Emergency PlugDec 15, 2025 (Eve)Rock/sandbag plug by crews + WA National GuardKing County
Permanent ReconstructionDelayed toward 2031Full-scale structural rebuild timelineKing County DNRP

Operational Exposure & Facility Playbook

  • Desimone's temporary plug holds the line today, but King County DNRP planning places permanent structural reconstruction out toward 2031—meaning five-plus winters of interim risk.
  • Facilities in Tukwila, Kent, and Renton should treat the Desimone reach as an active interim-repair zone during atmospheric-river forecasts.
  • No specific space-company plant inundation is implied beyond the documented Tukwila/Kent/Renton industrial footprint and SR 167 closure.

Connected Valley Cities, Segments & Role Briefs

Primary Sources & Agency References

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence