Program-close self-assessment scorecard for FRAME-300-BCESG (300 packages, 67 core + 4 adjacent, 10 cities, dated 2026-11-16).
READINESS · ROLE PATHS & DATED CALENDAR · COMPLETE FRAME-300-BCESG (300 PACKAGES)
Readiness Self-Assessment & Index
The closing self-assessment scorecard for Washington space-cluster operators, mapping every readiness domain across all nine sections (300 packages) of FRAME-300-BCESG—from the 67-company census to supplier asks, dead/live rules, role briefs, valley continuity, state incentives, and orbital disposal.
Primary Authority / Source: BC ESG (Hub #1382 · 2026-11-16) | As-Of / Horizon: 2026-11-16

Readiness Checklist & Corpus Traceability
- 1. Cluster & Segment Baseline (96 pkgs): Locate your company and segment peers in the WA Space Cluster Census Hub (67 core + 4 adjacent, 10 cities) and By Segment.
- 2. Supplier Asks & Dead/Live Rules (70 pkgs): Separate live mandates from dead rules using Dead-Rule Cleanup Audit and Prime RFP ESG Packet.
- 3. Role & Valley Continuity (66 pkgs): Assign 90-day ownership via By Role Desk Briefs and verify floodplain/OSOW plans via Valley Floodplain Continuity.
- 4. State Fight, Orbital & Readiness (68 pkgs): Benchmark WA tax/siting reality (WA Tax Reality Check), orbital disposal (Orbital Disposal & ODAR), and Dated Calendar 2026-2031.
FRAME-300-BCESG Nine-Section Readiness Scorecard (300/300)
| Section (Batch) | Count | Self-Assessment Question & Entry Point |
|---|---|---|
| 1. Census (B1–B2) | 60 | Is our facility/city profile verified? Hub #1382 |
| 2. By Segment (B3) | 36 | Do we match segment asks & peers? Launch Overview |
| 3. Supplier Asks (B4) | 40 | Are CMRT/PFAS/DFARS/Code packets staged? Boeing Code |
| 4. Rules Died/Live (B5) | 30 | Have we cut dead FAR/SEC/SB 261 spend? FAR Dead |
| 5. By Role (B6) | 26 | Does each seat own its 30/60/90 tasks? Compliance Brief |
| 6. Freight/Valley (B7) | 40 | Is our October flood & OSOW plan tested? 72-Hr Playbook |
| 7. State Fight (B8) | 26 | Are WA B&O/SRF & TX/FL ceilings modeled? Matrix |
| 8. Orbital (B9) | 22 | Are FCC 5-yr & ODAR gates in CDR? EOL Checklist |
| 9. Readiness (B10) | 20 | Is our dated 2026–2031 calendar live? Calendar |
Operator Execution & Boundary Notes
- Total program arithmetic closes cleanly:
60 + 36 + 40 + 30 + 26 + 40 + 26 + 22 + 20 = 300packages. - Every checklist item in Readiness (Batch 10) traces to a sourced primary instrument in Batches 1–9 or BC ESG anchors
#342/#853. - Use the WA Space Cluster Census Hub (
#1382) or/llms.txtfor complete 300-URL navigation.
Connected Corpus Source Pieces
- WA Space Cluster Census Hub (#1382)
- Dead-Rule Cleanup Audit
- Dated Calendar (2026-2031)
- Valley Floodplain Continuity
- Orbital Disposal & ODAR Readiness
