# WA Space Cluster Readiness Self-Assessment & FRAME-300 Corpus Index

*Program-close self-assessment scorecard for FRAME-300-BCESG (300 packages, 67 core + 4 adjacent, 10 cities, dated 2026-11-16).*

- **Section:** Readiness (Role Paths & Dated Calendar)
- **Evidence Basis:** Complete FRAME-300-BCESG (300 Packages)
- **Primary Authority / Source:** BC ESG (Hub #1382 · 2026-11-16)
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-program-self-assessment-scorecard.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-program-self-assessment-scorecard-infographic.png)

> The closing self-assessment scorecard for Washington space-cluster operators, mapping every readiness domain across all nine sections (300 packages) of FRAME-300-BCESG—from the 67-company census to supplier asks, dead/live rules, role briefs, valley continuity, state incentives, and orbital disposal.

## Readiness Checklist & Corpus Traceability

- **1. Cluster & Segment Baseline (96 pkgs):** Locate your company and segment peers in the [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/) (67 core + 4 adjacent, 10 cities) and [By Segment](https://bcesg.org/wa-space-launch-segment-overview/).
- **2. Supplier Asks & Dead/Live Rules (70 pkgs):** Separate live mandates from dead rules using [Dead-Rule Cleanup Audit](https://bcesg.org/wa-space-readiness-dead-rule-cleanup-audit/) and [Prime RFP ESG Packet](https://bcesg.org/wa-space-readiness-prime-rfp-disclosure-packet/).
- **3. Role & Valley Continuity (66 pkgs):** Assign 90-day ownership via [By Role Desk Briefs](https://bcesg.org/wa-space-role-founder-ceo-desk-brief/) and verify floodplain/OSOW plans via [Valley Floodplain Continuity](https://bcesg.org/wa-space-readiness-green-river-floodplain-continuity/).
- **4. State Fight, Orbital & Readiness (68 pkgs):** Benchmark WA tax/siting reality ([WA Tax Reality Check](https://bcesg.org/wa-space-readiness-wa-tax-incentive-reality-check/)), orbital disposal ([Orbital Disposal & ODAR](https://bcesg.org/wa-space-readiness-orbital-disposal-odar-checklist/)), and [Dated Calendar 2026-2031](https://bcesg.org/wa-space-readiness-dated-calendar-2026-2031/).

## FRAME-300-BCESG Nine-Section Readiness Scorecard (300/300)

| Section (Batch) | Count | Self-Assessment Question & Entry Point |
| :--- | :--- | :--- |
| 1. Census (B1–B2) | 60 | Is our facility/city profile verified? [Hub #1382](https://bcesg.org/washington-space-cluster-census/) |
| 2. By Segment (B3) | 36 | Do we match segment asks & peers? [Launch Overview](https://bcesg.org/wa-space-launch-segment-overview/) |
| 3. Supplier Asks (B4) | 40 | Are CMRT/PFAS/DFARS/Code packets staged? [Boeing Code](https://bcesg.org/wa-space-ask-boeing-supplier-code-of-conduct/) |
| 4. Rules Died/Live (B5) | 30 | Have we cut dead FAR/SEC/SB 261 spend? [FAR Dead](https://bcesg.org/wa-space-rule-far-case-2021-015-withdrawn/) |
| 5. By Role (B6) | 26 | Does each seat own its 30/60/90 tasks? [Compliance Brief](https://bcesg.org/wa-space-role-compliance-lead-desk-brief/) |
| 6. Freight/Valley (B7) | 40 | Is our October flood & OSOW plan tested? [72-Hr Playbook](https://bcesg.org/wa-space-playbook-72-hour-valley-flood-levee-breach/) |
| 7. State Fight (B8) | 26 | Are WA B&O/SRF & TX/FL ceilings modeled? [Matrix](https://bcesg.org/wa-space-fight-site-selector-decision-matrix/) |
| 8. Orbital (B9) | 22 | Are FCC 5-yr & ODAR gates in CDR? [EOL Checklist](https://bcesg.org/wa-space-orbital-eol-design-checklist-wa/) |
| 9. Readiness (B10) | 20 | Is our dated 2026–2031 calendar live? [Calendar](https://bcesg.org/wa-space-readiness-dated-calendar-2026-2031/) |

## Operator Execution & Boundary Notes

- Total program arithmetic closes cleanly: `60 + 36 + 40 + 30 + 26 + 40 + 26 + 22 + 20 = 300` packages.
- Every checklist item in Readiness (Batch 10) traces to a sourced primary instrument in Batches 1–9 or BC ESG anchors `#342` / `#853`.
- Use the [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/) (`#1382`) or `/llms.txt` for complete 300-URL navigation.

## Connected Corpus Source Pieces

- [WA Space Cluster Census Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Dead-Rule Cleanup Audit](https://bcesg.org/wa-space-readiness-dead-rule-cleanup-audit/)
- [Dated Calendar (2026-2031)](https://bcesg.org/wa-space-readiness-dated-calendar-2026-2031/)
- [Valley Floodplain Continuity](https://bcesg.org/wa-space-readiness-green-river-floodplain-continuity/)
- [Orbital Disposal & ODAR Readiness](https://bcesg.org/wa-space-readiness-orbital-disposal-odar-checklist/)

## Primary Authorities & Official Records

- [47 CFR 25.283 (eCFR)](https://www.ecfr.gov/current/title-47/chapter-I/subchapter-B/part-25/subpart-D/section-25.283)
- [WA Commerce Clean Buildings](https://www.commerce.wa.gov/building-infrastructure/clean-buildings/)
