MODELED SCENARIO: This is a regional emergency-planning model, not a historical event log. Never blend modeled scenarios with dated events.
FREIGHT, RAIL & VALLEY · THE CORRIDORS · MODELED SCENARIO (COUNTY ANNEX)
Modeled I-5 Saturation (Recovery Annex)
The Puget Sound Regional Catastrophic Disaster Coordination Plan Transportation Recovery Annex models multi-corridor disruptions where SR 167 closures leave no parallel high-capacity alternate except an already saturated I-5.
Primary Agency / Source: WA EMD / Puget Sound Regional Catastrophic Plan | As-Of / Horizon: 2026-11-16 (Modeled Planning Scenario)

Documented Corridor Facts & Continuity Record
- MODELED SCENARIO: Developed collaboratively by King County and regional partners under the Puget Sound Regional Catastrophic Disaster Coordination Plan.
- The Transportation Recovery Annex models major roadway disruptions (catastrophic flooding or earthquake-induced liquefaction) affecting north-south valley lifelines.
- When SR 167 closes in the model, diverted commercial and commuter traffic has no parallel high-capacity freeway alternate except I-5—which saturates rapidly.
Modeled Scenario vs. Historical Event Separation
| Item | Classification | What It Establishes | Source |
|---|---|---|---|
| Transportation Recovery Annex | MODELED SCENARIO | SR 167 closure forces traffic onto saturated I-5 | WA EMD / King County |
| Dec 15, 2025 SR 167 Closure | HISTORICAL EVENT | 6 miles of SR 167 actually closed on Dec 15, 2025 | King County / WSDOT |
| Detour & Priority Toolboxes | PLANNING FRAMEWORK | Pre-identified alternate routes & priority tiers | WA EMD Plans |
Operational Exposure & Facility Playbook
- Because the Dec 15, 2025 closure validated the Annex's single-corridor dependency in miniature, facilities should treat I-5 gridlock as a certainty during any SR 167 shutdown.
- Do not assume emergency-priority freight passes are automatic; commercial space hardware requires pre-coordinated staging outside the valley.
- Keep modeled scenario assumptions clearly labeled in supplier continuity questionnaires so auditors never confuse drills with actual losses.
Connected Valley Cities, Segments & Role Briefs
- WA Space Cluster Hub (#1382)
- Kent WA Space Cluster Profile
- Tukwila WA Space Cluster Profile
- Program Manager Desk Brief
- Facilities / EHS Desk Brief
- Satellite Mfg Continuity Exposure
