# Modeled Scenario: Why the Regional Transportation Recovery Annex Shows I-5 Saturated When SR 167 Closes

- **Site:** bcesg.org
- **Program:** FRAME-300-BCESG — Freight, Rail & the Valley
- **Pillar:** The Corridors
- **Evidence Basis:** Modeled Scenario (County Annex)
- **Primary Agency / Source:** WA EMD / Puget Sound Regional Catastrophic Plan
- **As-Of / Repair Horizon:** 2026-11-16 (Modeled Planning Scenario)
- **2-Page Reference PDF:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-corridor-i5-saturation-recovery-annex.pdf
- **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-corridor-i5-saturation-recovery-annex-infographic.png

> *MODELED SCENARIO: This is a regional emergency-planning model, not a historical event log. Never blend modeled scenarios with dated events.*

## Summary

The Puget Sound Regional Catastrophic Disaster Coordination Plan Transportation Recovery Annex models multi-corridor disruptions where SR 167 closures leave no parallel high-capacity alternate except an already saturated I-5.

## Documented Corridor Facts & Continuity Record

- MODELED SCENARIO: Developed collaboratively by King County and regional partners under the Puget Sound Regional Catastrophic Disaster Coordination Plan.
- The Transportation Recovery Annex models major roadway disruptions (catastrophic flooding or earthquake-induced liquefaction) affecting north-south valley lifelines.
- When SR 167 closes in the model, diverted commercial and commuter traffic has no parallel high-capacity freeway alternate except I-5—which saturates rapidly.

## Modeled Scenario vs. Historical Event Separation

| Item | Classification | What It Establishes | Source |
| --- | --- | --- | --- |
| Transportation Recovery Annex | MODELED SCENARIO | SR 167 closure forces traffic onto saturated I-5 | WA EMD / King County |
| Dec 15, 2025 SR 167 Closure | HISTORICAL EVENT | 6 miles of SR 167 actually closed on Dec 15, 2025 | King County / WSDOT |
| Detour & Priority Toolboxes | PLANNING FRAMEWORK | Pre-identified alternate routes & priority tiers | WA EMD Plans |

## Operational Exposure & Facility Playbook

- Because the Dec 15, 2025 closure validated the Annex's single-corridor dependency in miniature, facilities should treat I-5 gridlock as a certainty during any SR 167 shutdown.
- Do not assume emergency-priority freight passes are automatic; commercial space hardware requires pre-coordinated staging outside the valley.
- Keep modeled scenario assumptions clearly labeled in supplier continuity questionnaires so auditors never confuse drills with actual losses.

## Connected Valley Cities, Segments & Role Briefs

- [WA Space Cluster Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Kent WA Space Cluster Profile](https://bcesg.org/kent-wa-space-cluster-profile/)
- [Tukwila WA Space Cluster Profile](https://bcesg.org/tukwila-wa-space-cluster-profile/)
- [Program Manager Desk Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/)
- [Facilities / EHS Desk Brief](https://bcesg.org/wa-space-role-facilities-ehs-desk-brief/)
- [Satellite Mfg Continuity Exposure](https://bcesg.org/wa-satellite-manufacturing-continuity-exposure/)

## Primary Sources & Agency References

- [WA EMD Regional Plans (Recovery Annex)](https://mil.wa.gov/plans)
- [WSDOT I-405 / SR 167 Corridor Program](https://wsdot.wa.gov/construction-planning/major-projects/i-405sr-167-corridor-program)
- [King County Flood Services](https://kingcounty.gov/en/dept/dnrp/nature-recreation/environment-ecology-conservation/flood-services)
