WA Aerospace Tax Preferences (RCW 82.04.260): LIVE — 0.484% Rate Through Dec 31, 2026; 0.357% Suspended

Pacific Northwest river valley industrial logistics corridor with freight rail and aerospace warehouses
LIVEWashington Aerospace B&O Tax Preferences & Apprentice Reporting (RCW 82.04.260)
Deciding Instrument: RCW 82.04.260(11) & RCW 49.04.220 (Apprentice Utilization)  |  Date: December 31, 2026 (0.484% End) / June 30, 2040 (R&D & FAR 145 Sunset)
Verdict & Proof: Washington's aerospace tax regime (RCW 82.04.260) is LIVE with a critical year-end rate shift: the 0.484% commercial-airplane manufacturing B&O rate runs through December 31, 2026 (stepping to 0.5% on Jan 1, 2027), the 0.357% rate remains conditionally suspended, and FAR 145 repair (0.2904%) and aerospace R&D preferences run through June 30, 2040.
RULE STATUS BRIEF · PDF & MARKDOWN TWIN
WA Aerospace Tax Rules (LIVE)
Download the formatted 2-page rule-status brief (PDF) or read the single-source Markdown twin for WA Aerospace Tax Rules (LIVE).
WA Aerospace Tax Preferences (RCW 82.04.260): 2026–2040 Rate Map

Who Owes What by When: B&O Rates & Annual Tax Performance Reports

Under RCW 82.04.260(11), qualifying commercial airplane and component manufacturers pay a 0.484% B&O rate through December 31, 2026, transitioning to 0.5% on January 1, 2027. The lower 0.357% rate enacted under ESB 6690 remains conditionally suspended pending international trade triggers.

Meanwhile, aerospace non-manufacturing product development (0.9% B&O / R&D credits) and FAR Part 145 repair stations (0.2904%) remain active through June 30, 2040. Qualifying firms must file annual DOR Tax Performance Reports and L&I Apprentice Utilization Rate disclosures (RCW 49.04.220).

  • 0.484% -> 0.5% B&O transition on January 1, 2027.
  • 0.357% preferential rate is NOT active.
  • Annual DOR Tax Performance Report required to retain preferences.
PreferenceRateStatus & Sunset
Commercial Airplane/Component Mfg0.484% -> 0.5% (Jan 1, 2027)LIVE (Annual DOR report required)
Conditional WTO Mfg Rate0.357%SUSPENDED — Trigger not met
FAR Part 145 Repair / R&D Credits0.2904% / 0.9%LIVE through June 30, 2040

Related BC ESG Guides & Verified Primary Sources

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence