# WA Aerospace Tax Preferences (RCW 82.04.260): LIVE — 0.484% Rate Through Dec 31, 2026; 0.357% Suspended

> **Rule:** Washington Aerospace B&O Tax Preferences & Apprentice Reporting (RCW 82.04.260) | **Status:** LIVE | **Instrument:** RCW 82.04.260(11) & RCW 49.04.220 (Apprentice Utilization) | **Date:** December 31, 2026 (0.484% End) / June 30, 2040 (R&D & FAR 145 Sunset)  
> **Canonical URL:** https://bcesg.org/wa-space-rule-wa-aerospace-tax-preferences-live/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-wa-aerospace-tax-preferences-live.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-wa-aerospace-tax-preferences-live-infographic.png

**Verdict & Proof:** Washington's aerospace tax regime (RCW 82.04.260) is LIVE with a critical year-end rate shift: the 0.484% commercial-airplane manufacturing B&O rate runs through December 31, 2026 (stepping to 0.5% on Jan 1, 2027), the 0.357% rate remains conditionally suspended, and FAR 145 repair (0.2904%) and aerospace R&D preferences run through June 30, 2040.

## Who Owes What by When: B&O Rates & Annual Tax Performance Reports

Under RCW 82.04.260(11), qualifying commercial airplane and component manufacturers pay a 0.484% B&O rate through December 31, 2026, transitioning to 0.5% on January 1, 2027. The lower 0.357% rate enacted under ESB 6690 remains conditionally suspended pending international trade triggers.

Meanwhile, aerospace non-manufacturing product development (0.9% B&O / R&D credits) and FAR Part 145 repair stations (0.2904%) remain active through June 30, 2040. Qualifying firms must file annual DOR Tax Performance Reports and L&I Apprentice Utilization Rate disclosures (RCW 49.04.220).

- 0.484% -> 0.5% B&O transition on January 1, 2027.
- 0.357% preferential rate is NOT active.
- Annual DOR Tax Performance Report required to retain preferences.

| Preference | Rate | Status & Sunset |
| --- | --- | --- |
| Commercial Airplane/Component Mfg | 0.484% -> 0.5% (Jan 1, 2027) | LIVE (Annual DOR report required) |
| Conditional WTO Mfg Rate | 0.357% | SUSPENDED — Trigger not met |
| FAR Part 145 Repair / R&D Credits | 0.2904% / 0.9% | LIVE through June 30, 2040 |

## Related BC ESG Guides & Verified Primary Sources

- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [WA CBPS Standard (LIVE)](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/)
- [RCW 82.04.260 (Washington Legislature)](https://app.leg.wa.gov/RCW/default.aspx?cite=82.04.260)
