Who Issues This Ask, Authority, and Binding Status
AS9102 First Article Inspection (FAI) asks are issued by every launch, satellite, and propulsion prime (Blue Origin, SpaceX, Stoke Space, The Boeing Company) on new part numbers, engineering revisions, or facility moves.
SAE AS9102C is an industry standard, not a statute; it is contractually binding when invoked by the buyer's PO or AS9100D Clause 8.5.1.3.
| FAIR Form | Required Evidence | Common Audit Failure |
|---|---|---|
| Form 1 | Part/drawing rev, serial number, sub-tier FAIR IDs | Mismatched drawing revision |
| Form 2 | Alloy heat/lot certs, Nadcap special-process CoCs | Missing DFARS specialty-metal melt origin |
| Form 3 | 100% ballooned print dimensions & actual CMM values | Unverified GD&T datums or missing notes |
Evidence Required & Small-Supplier Effort Cost
Suppliers submit a complete First Article Inspection Report (FAIR)—typically via Net-Inspect or PDF—comprising Form 1 (Part Number Accountability), Form 2 (Product Accountability: raw material certs, special process CoCs, functional tests), and Form 3 (Characteristic Accountability keyed to a ballooned engineering drawing).
Internal CMM/inspection and Net-Inspect hours per part are not in our data.
WA Space Cluster Segments & Companies Affected
Affects all build-to-print machine shops and composite fabricators in Components & Suppliers (Space Valves, Janicki Industries) and Adjacent Aerospace (Tessera, Orion Industries).