# AS9102 First Article Inspection (FAI) Packages for WA Space Shops

> **Canonical URL:** https://bcesg.org/wa-space-ask-as9102-first-article-inspection/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-as9102-first-article-inspection.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-as9102-first-article-inspection-infographic.png

**Sourced Baseline:** Issued by space primes and Tier-1s under SAE AS9102 (current revision AS9102C). Voluntary industry standard that becomes contractually binding on first production runs, design changes, or source transfers.

## Who Issues This Ask, Authority, and Binding Status

AS9102 First Article Inspection (FAI) asks are issued by every launch, satellite, and propulsion prime ([Blue Origin](https://bcesg.org/blue-origin-washington-space-cluster-profile/), [SpaceX](https://bcesg.org/spacex-redmond-washington-space-cluster-profile/), [Stoke Space](https://bcesg.org/stoke-space-washington-space-cluster-profile/), [The Boeing Company](https://bcesg.org/the-boeing-company-washington-space-cluster-profile/)) on new part numbers, engineering revisions, or facility moves.

SAE AS9102C is an **industry standard**, not a statute; it is **contractually binding** when invoked by the buyer's PO or AS9100D Clause 8.5.1.3.

| FAIR Form | Required Evidence | Common Audit Failure |
| --- | --- | --- |
| Form 1 | Part/drawing rev, serial number, sub-tier FAIR IDs | Mismatched drawing revision |
| Form 2 | Alloy heat/lot certs, Nadcap special-process CoCs | Missing DFARS specialty-metal melt origin |
| Form 3 | 100% ballooned print dimensions & actual CMM values | Unverified GD&T datums or missing notes |

## Evidence Required & Small-Supplier Effort Cost

Suppliers submit a complete **First Article Inspection Report (FAIR)**—typically via Net-Inspect or PDF—comprising **Form 1** (Part Number Accountability), **Form 2** (Product Accountability: raw material certs, special process CoCs, functional tests), and **Form 3** (Characteristic Accountability keyed to a ballooned engineering drawing).

Internal CMM/inspection and Net-Inspect hours per part are **not in our data**.

## WA Space Cluster Segments & Companies Affected

Affects all build-to-print machine shops and composite fabricators in [Components & Suppliers](https://bcesg.org/wa-space-components-materials-disclosure-compliance/) ([Space Valves](https://bcesg.org/space-valves-puyallup-washington-space-cluster-profile/), [Janicki Industries](https://bcesg.org/janicki-industries-sedro-woolley-washington-space-cluster-profile/)) and [Adjacent Aerospace](https://bcesg.org/wa-space-adjacent-aerospace-operators-kent-auburn/) ([Tessera](https://bcesg.org/wa-space-adjacent-aerospace-operators-kent-auburn/), [Orion Industries](https://bcesg.org/wa-space-adjacent-aerospace-operators-kent-auburn/)).

## Related BC ESG Guides & Verified Primary Sources

- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [Components & Materials Compliance](https://bcesg.org/wa-space-components-materials-disclosure-compliance/)
- [AS9100D & IA9100 Quality Gate](https://bcesg.org/wa-space-ask-as9100d-ia9100-quality-gate/)
- [Nadcap Special Processes](https://bcesg.org/wa-space-ask-nadcap-special-processes/)
- [SAE — AS9102C First Article Inspection Requirements](https://www.sae.org/standards/as9102c-aerospace-series-first-article-inspection-requirements/)
- [IAQG — International Aerospace Quality Group](https://iaqg.org/)
