Do the stack in order unless engineering says otherwise. Most wasted CapEx in existing buildings is a plant replacement that never got metering, controls, or load reduction first.
- Measure — metering, ESPM hygiene, LL84 as the LL97 spine
- Controls and operations — schedules, setpoints, BMS basics
- Load reduction — envelope, lighting, plug loads
- Efficient thermal — plant optimization, heat recovery
- Electrification readiness — electrical capacity, heat-pump pathways
- On-site / off-site clean energy tools — only after load work; document claims carefully
- Resilience co-benefits — backup, heat resilience (BC playbook)
NYC twist
Run the $268 calculator and 2030 scenarios before major plant decisions so you don’t optimize for the wrong decade. A 2026-compliant building can still be a 2030 problem at the same EUI.
Boards: tie the stack to a resolution and a reserve study, not a single vendor pitch. See the co-op / condo playbook.