
Who Owes What by When: Triggered at Local Permit Application
Whenever a Washington space company applies for a non-exempt grading permit, conditional use permit, shoreline permit, or major industrial building permit in Kent, Tukwila, Redmond, Bothell, Marysville, or Moses Lake, the lead local agency conducts a SEPA threshold determination under RCW 43.21C and WAC 197-11.
Recent statutory appeal safe harbors (RCW 43.21C.495 and 43.21C.229) apply to urban housing, middle housing, and transit-oriented development—not to rocket test stands, chemical storage, or heavy manufacturing.
- Requires SEPA Environmental Checklist at permit intake.
- Outcomes: Determination of Nonsignificance (DNS), Mitigated DNS (MDNS), or full EIS.
- Interlocks directly with King County Critical Areas and PSCAA air permits.
| SEPA Document | Trigger | Status |
|---|---|---|
| SEPA Environmental Checklist | Non-exempt industrial/land-use permit | LIVE — Required at application |
| DNS / MDNS | No significant adverse impact (with/without mitigation) | LIVE — Subject to comment/appeal |
| Environmental Impact Statement (EIS) | Probable significant adverse impact | LIVE — Full study required |
NEPA vs. SEPA
SEPA is a state-law gate independent of federal NEPA; streamlining federal NEPA for FAA launch licenses does not waive SEPA for Washington ground facilities.
