The Dead FAR Climate Rule (FAR Case 2021-015): What Died in Jan 2025

Aerial dusk view over Puget Sound aerospace manufacturing corridor with Mount Rainier in the distance
BC ESG · WA Space Cluster Supplier Asks (November 16, 2026)
Sourced Baseline: DEAD RULE: On January 13, 2025, DoD, GSA, and NASA formally withdrew FAR Case 2021-015 (90 FR 2663) and closed the rulemaking. There is zero sweeping FAR or DoD/NASA mandate requiring space contractors to disclose Scope 1/2/3 GHG emissions or set SBTi targets.
TAKEAWAY BRIEF · PDF & MARKDOWN TWIN
Dead FAR Climate Rule (Jan 2025)
Download the formatted 2-page briefing sheet (PDF) or read the single-source Markdown twin for Dead FAR Climate Rule (Jan 2025).
DEAD-RULE BOUNDARY: FAR Case 2021-015 Withdrawn

What Died on January 13, 2025 (And Why Suppliers Still Hear About It)

In November 2022 (87 FR 68312), the FAR Council proposed FAR Case 2021-015 (Disclosure of Greenhouse Gas Emissions and Climate-Related Financial Risk), which would have forced major federal contractors to publish Scope 1, 2, and 3 GHG inventories, disclose climate-financial risks, and set science-based reduction targets (SBTi).

That rule is dead. On January 13, 2025 (90 FR 2663), DoD, GSA, and NASA formally withdrew FAR Case 2021-015 and closed the case, citing insufficient time and a shifting regulatory landscape. Any outdated questionnaire, consultant pitch, or legacy RFP template claiming a 'federal FAR Scope 3 mandate' is citing a withdrawn, non-existent rule.

Climate / ESG RuleCurrent Status (Nov 2026)Impact on WA Space Suppliers
FAR Case 2021-015 (Federal GHG/SBTi)DEAD — Withdrawn Jan 13, 2025 (90 FR 2663)$0 federal mandate; reject false 'FAR GHG' claims
CA SB 253 Scope 1 & 2LIVE for >$1B CA entities (Nov 10, 2026)No direct duty on <$1B WA firms
CA SB 253 Scope 3Not required in 2026 (starts 2027)No 2026 statutory Scope 3 flow-down
CA SB 261Enjoined (see BC ESG Post #916)Not enforced while injunction stands

Evidence Required & Effort Cost Today

Zero. Because FAR Case 2021-015 was withdrawn before finalization, there is no federal FAR GHG disclosure clause, no DoD climate-disclosure deviation in force, and no federal requirement to register SBTi targets. Effort cost to satisfy a dead rule is $0.

If a prime contractor still asks for carbon data, it is doing so voluntarily (e.g., IAEG/EcoVadis or CDP) or to prepare for California SB 253 (Scope 1 & 2 due Nov 10, 2026 for >$1B CA entities; Scope 3 delayed to 2027).

WA Space Cluster Segments & Companies Affected

This dead-rule boundary protects every WA space supplier across Launch, Satellite Manufacturing, Propulsion, Components & Suppliers, and Software & Mission Services from misallocating compliance budgets to defunct federal GHG mandates.

Related BC ESG Guides & Verified Primary Sources

Underlying Rule Status & Deciding Instruments (Batch 5)

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence