FAR Part 23 Sustainable Procurement Clauses That Survived Jan 2025

Aerial dusk view over Puget Sound aerospace manufacturing corridor with Mount Rainier in the distance
BC ESG · WA Space Cluster Supplier Asks (November 16, 2026)
Sourced Baseline: Binding federal clauses (48 CFR Part 23) that remain live after the Jan 13, 2025 withdrawal of FAR Case 2021-015. Covers EPA-designated/BioPreferred products, Energy Star/FEMP, and hazardous-material SDSs—with ZERO Scope 1/2/3 GHG or SBTi requirement.
TAKEAWAY BRIEF · PDF & MARKDOWN TWIN
Surviving FAR Part 23 Clauses
Download the formatted 2-page briefing sheet (PDF) or read the single-source Markdown twin for Surviving FAR Part 23 Clauses.
FAR Part 23: What Survived vs. What Died in Jan 2025

Who Issues This Ask, Authority, and Dead-Rule Boundary

Federal prime contractors and GSA/DoD/NASA buyers continue to flow down FAR Part 23 (48 CFR Part 23) clauses in Master Terms & Conditions.

Dead-rule boundary: Do not confuse surviving FAR Part 23 product clauses with the withdrawn climate rule. FAR Case 2021-015 was withdrawn on January 13, 2025 (90 FR 2663)—so FAR Part 23 carries zero Scope 1/2/3 GHG reporting or SBTi target mandate. What did survive and remains binding federal law when included in a contract are product/chemical clauses: Hazardous Material Identification & Material Safety Data (52.223-3), Ozone-Depleting Substances / HFCs (52.223-11), and BioPreferred / Energy Star / FEMP (52.223-2, -15, -17) where applicable to facility supplies and COTS equipment.

FAR Part 23 ClauseStatus (Nov 2026)What It Actually Asks
FAR 52.223-3LIVE & BindingSubmit SDSs for hazardous materials delivered under contract
FAR 52.223-11LIVE & BindingLabel/restrict ozone-depleting substances & high-GWP HFCs
FAR Case 2021-015 (GHG)DEAD (Jan 13, 2025)Withdrawn (90 FR 2663); zero GHG/SBTi duty

Evidence Required & Small-Supplier Effort Cost

For flight hardware and shop consumables, suppliers provide Safety Data Sheets (SDS) under 52.223-3 and confirm absence of prohibited Class I/II ODS under 52.223-11 (or document NASA/DoD mission-critical exemptions).

Administrative effort is minimal for SDS submission; exact hours are not in our data.

WA Space Cluster Segments & Companies Affected

Applies to all federal-subcontracting WA suppliers across Launch, Propulsion, and Components & Suppliers.

Related BC ESG Guides & Verified Primary Sources

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence