Cowboy Space in Washington’s Space Cluster: Facilities, Segment & Disclosure Posture

Pacific Northwest river valley industrial logistics corridor with freight rail and aerospace warehouses
BC ESG · Washington Space Cluster Census (November 16, 2026)
Sourced Baseline: Census ID WA-SPC-035 (Orbital Data Centers, core). Verified facility: Kent, WA (~290,000 sq ft facility). Private-company figures are labeled as reported, never as audited filings.
TAKEAWAY BRIEF · PDF & MARKDOWN TWIN
Cowboy Space — WA Space Cluster Profile
Download the formatted 2-page briefing sheet (PDF) or read the single-source Markdown twin for Cowboy Space — WA Space Cluster Profile.
Cowboy Space (WA-SPC-035): Orbital Data Centers · Kent

What Cowboy Space Builds and Operates in Washington

Develops orbital data centers, space solar power architectures, and the Big Iron 15-ton-payload launch vehicle (CLM-01, CLM-19).

Leased a reported ~290,000–291,035 sq ft industrial facility in Kent, WA (7650 S. 228th St.) following its rename from Aetherflux and a reported $275M May 2026 financing (CLM-19).

FieldVerified Record
Census ID & TierWA-SPC-035 (core)
SegmentOrbital Data Centers
WA FacilityKent, WA (~290,000 sq ft facility)
OwnershipPrivate (venture-backed; formerly Aetherflux)
Census Size SignalFormerly Aetherflux; raised $275M (May 2026); orbital data centers & Big Iron rocket

Disclosure & Continuity Surface

Private startup with a very thin corporate ESG and financial disclosure surface (no SEC filings, no published sustainability report). Operational continuity centers on Kent Valley Lower Green River floodplain exposure (CLM-07, CLM-19).

Related BC ESG Guides & Verified Primary Sources

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence