Strict attribution separating PSRC 2022 (2021 data) from Space Northwest / BERK Sept 2026 PRELIMINARY figures.
THE STATE FIGHT · WA COUNCIL & RECORD · PSRC 2022 VS. PRELIMINARY BERK 2026
PSRC 2022 vs. Preliminary BERK 2026
The Governor's $4.6B economic impact and $1.6B labor income figures trace to PSRC's 2022 study of 2021 data, whereas Space Northwest and BERK Consulting's September 2026 release reports preliminary figures of $8.1B direct output ($12.4B total), 34,200 total jobs, and >68% of active satellites—which remain labeled preliminary.
Primary Authority / Source: PSRC / Space Northwest & BERK | As-Of / Horizon: 2022 Study vs. Sept 2026 Preliminary

Documented Policy & Site-Selection Record
- PSRC 2022 Benchmark (2021 Data): The $4.6 billion economic impact and $1.6 billion labor income figures cited in state releases trace to the Puget Sound Regional Council's 2022 study analyzing 2021 data (up from $1.8 billion in 2018).
- Space Northwest / BERK 2026 (PRELIMINARY): Unveiled in September 2026 at the Space Northwest Symposium, BERK Consulting and Alliance Velocity's study reports preliminary estimates of $8.1 billion in annual direct output ($12.4 billion total statewide impact).
- Employment & Satellite Share (PRELIMINARY): The same preliminary Sept 2026 release cites 34,200 total supported jobs (~12,300 direct) and >68% of active satellites in Earth orbit built in Washington (led by Starlink in Redmond).
- Labeling Standard: Because Space Northwest / BERK 2026 figures are labeled preliminary in their own source document, BC ESG preserves the 'preliminary' qualifier everywhere they appear.
Economic Impact Studies Compared (Attributed & Labeled)
| Study / Release | Data Year / Status | Output & Income | Jobs / Share |
|---|---|---|---|
| PSRC 2022 Study | 2021 data (Final) | $4.6B economic impact; $1.6B labor income | Doubled from $1.8B in 2018 |
| Space NW / BERK (Sept 2026) | 2026 release (PRELIMINARY) | $8.1B direct output; $12.4B total (preliminary) | 34,200 total / ~12,300 direct (preliminary) |
| Orbital Share (BERK 2026) | 2026 release (PRELIMINARY) | Driven by Redmond constellation manufacturing | >68% of active satellites in orbit (preliminary) |
Founder, Staffer & Site-Selector Takeaways
- Staffer Takeaway: Never blend PSRC 2022 ($4.6B) and preliminary BERK 2026 ($8.1B direct) into one unattributed trendline without citing the methodology change and 2021 vs. 2026 base years.
- Reader Takeaway: Satellite share (>68%, preliminary) reflects high-volume constellation manufacturing in Redmond alongside 67 publicly enumerable core operators.
Connected Census Profiles, Segments & Valley Corridors
- WA Space Cluster Hub (#1382)
- The 90-vs-67 Gap Analysis (#1385)
- SpaceX (Redmond) WA Profile
- Amazon Leo WA Profile
- Blue Origin WA Profile
