Washington Space Economics: PSRC 2022 ($4.6B / $1.6B) vs. Preliminary Space Northwest / BERK 2026 ($8.1B / 34,200 Jobs)

Engineers inspecting a modular satellite bus inside a Pacific Northwest aerospace cleanroom

Strict attribution separating PSRC 2022 (2021 data) from Space Northwest / BERK Sept 2026 PRELIMINARY figures.

THE STATE FIGHT · WA COUNCIL & RECORD · PSRC 2022 VS. PRELIMINARY BERK 2026
PSRC 2022 vs. Preliminary BERK 2026
The Governor's $4.6B economic impact and $1.6B labor income figures trace to PSRC's 2022 study of 2021 data, whereas Space Northwest and BERK Consulting's September 2026 release reports preliminary figures of $8.1B direct output ($12.4B total), 34,200 total jobs, and >68% of active satellites—which remain labeled preliminary.
Primary Authority / Source: PSRC / Space Northwest & BERK  |  As-Of / Horizon: 2022 Study vs. Sept 2026 Preliminary
THE STATE FIGHT · PDF & MARKDOWN TWIN
PSRC 2022 vs. Preliminary BERK 2026 — Reference Brief
Download the 2-page printable reference PDF or read the clean Markdown twin for AI and briefing workflows.
WA Space Economic Studies — PSRC 2022 vs. Preliminary BERK 2026
WA Space Economic Studies — PSRC 2022 vs. Preliminary BERK 2026

Documented Policy & Site-Selection Record

  • PSRC 2022 Benchmark (2021 Data): The $4.6 billion economic impact and $1.6 billion labor income figures cited in state releases trace to the Puget Sound Regional Council's 2022 study analyzing 2021 data (up from $1.8 billion in 2018).
  • Space Northwest / BERK 2026 (PRELIMINARY): Unveiled in September 2026 at the Space Northwest Symposium, BERK Consulting and Alliance Velocity's study reports preliminary estimates of $8.1 billion in annual direct output ($12.4 billion total statewide impact).
  • Employment & Satellite Share (PRELIMINARY): The same preliminary Sept 2026 release cites 34,200 total supported jobs (~12,300 direct) and >68% of active satellites in Earth orbit built in Washington (led by Starlink in Redmond).
  • Labeling Standard: Because Space Northwest / BERK 2026 figures are labeled preliminary in their own source document, BC ESG preserves the 'preliminary' qualifier everywhere they appear.

Economic Impact Studies Compared (Attributed & Labeled)

Study / ReleaseData Year / StatusOutput & IncomeJobs / Share
PSRC 2022 Study2021 data (Final)$4.6B economic impact; $1.6B labor incomeDoubled from $1.8B in 2018
Space NW / BERK (Sept 2026)2026 release (PRELIMINARY)$8.1B direct output; $12.4B total (preliminary)34,200 total / ~12,300 direct (preliminary)
Orbital Share (BERK 2026)2026 release (PRELIMINARY)Driven by Redmond constellation manufacturing>68% of active satellites in orbit (preliminary)

Founder, Staffer & Site-Selector Takeaways

  • Staffer Takeaway: Never blend PSRC 2022 ($4.6B) and preliminary BERK 2026 ($8.1B direct) into one unattributed trendline without citing the methodology change and 2021 vs. 2026 base years.
  • Reader Takeaway: Satellite share (>68%, preliminary) reflects high-volume constellation manufacturing in Redmond alongside 67 publicly enumerable core operators.

Connected Census Profiles, Segments & Valley Corridors

Primary Sources & Official Records

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence