FACILITIES / EHS20–500-Person WA Space Company Desk Brief
Top Live Mandate: WAC 173-303 Dangerous Waste, PSCAA Reg I & KCC 21A.24 | Dead Rule to Ignore: Federal Scope 3 & EPA Part 98 Non-Subpart W Repeal Proposal | Next Hard Date: Continuous (Every Permit, Manifest & Notice of Construction)
Desk Priority: Propulsion, coatings, and composite shops in the Puget Sound and Kent Valley face continuous permitting under WA Ecology WAC 173-303, PSCAA Regulation I, SEPA, and King County Zero-Rise Floodway rules.

1. What Arrives on This Desk (Live Asks & Rules)
For Propulsion, Launch, and Components facilities, EHS manages WA Ecology Dangerous Waste (WAC 173-303) and PSCAA Regulation I air permits (plus propellant/solvent waste handling asks), King County Floodplain KCC 21A.24, WA SEPA, and prime ISO 14001 EMS expectations.
2. What Is Dead or Enjoined and Can Be Ignored
State waste/air and county floodplain permits never paused. Ignore dead federal Scope 3 claims, and track EPA GHGRP Part 98 only if above threshold.
3. What Carries a Date (Deadlines & Instruments)
Continuous and statutory EHS instruments:
| Permit / Rule | Status | Trigger | Instrument |
|---|---|---|---|
| WA Ecology Dangerous Waste | LIVE | Generator tier & 90/180-day storage | WAC 173-303 / RCW 70A.300 |
| PSCAA Air Permits | LIVE | Before installing spray/curing/test equip. | PSCAA Regulation I |
| King County Floodplain | LIVE | Zero-Rise Floodway & +3 ft BFE | KCC 21A.24 |
| WA SEPA | LIVE | Industrial grading/expansion permits | RCW 43.21C / WAC 197-11 |
4. Internal Handoffs (Who Hands What to Whom)
EHS handoffs protect site continuity and supply-chain compliance:
| Handoff | Scope | Target Role |
|---|---|---|
| Facilities -> CEO | Floodplain/SEPA schedule & levee risk | Founder: WA Tax, Siting & Capital |
| Facilities -> Procurement | Chemical inventory for PFAS Part 705 & REACH | Procurement: Material Declarations |