FCC 5-Year LEO Deorbit Rule (47 CFR § 25.283) Supplier Flow-Downs

Engineers inspecting a modular satellite bus inside a Pacific Northwest aerospace cleanroom
BC ESG · WA Space Cluster Supplier Asks (November 16, 2026)
Sourced Baseline: Binding US federal regulation (47 CFR § 25.283, effective Sep 9, 2024) on FCC-licensed LEO satellite operators (<=2,000 km). Flows down to WA propulsion, passivation, and bus suppliers as propellant-budget, valve-venting, and casualty-risk specs.
TAKEAWAY BRIEF · PDF & MARKDOWN TWIN
FCC 5-Year Deorbit Flow-Downs
Download the formatted 2-page briefing sheet (PDF) or read the single-source Markdown twin for FCC 5-Year Deorbit Flow-Downs.
FCC 5-Year LEO Deorbit Rule (47 CFR § 25.283) Flow-Down

Who Issues This Ask, Authority, and Binding Status

Commercial LEO satellite operators—including SpaceX (Starlink), Amazon Leo, BlackSky, and Hubble Network—must satisfy the FCC's 5-year post-mission disposal rule (47 CFR § 25.283) for satellites below 2,000 km.

Binding status: 47 CFR § 25.283 is binding US federal law on FCC satellite licensees, and lands on WA hardware suppliers as contractual engineering specifications (propulsion total impulse, end-of-life passivation valves, and material melt-temperature data for NASA DAS casualty analysis).

FCC Rule ElementSupplier Engineering Deliverable
<= 5-Year Deorbit (<= 2,000 km)Propulsion delta-V & reliability qualification data
End-of-Life PassivationLatch/vent valve & battery discharge FMEA
Re-entry Casualty (< 1 in 10,000)Component alloy mass & melt-temp inputs for ODAR

Evidence Required & Small-Supplier Effort Cost

Suppliers provide thruster total-impulse qualification data, passivation reliability FMEAs, and alloy melt/mass properties for the prime's FCC Orbital Debris Assessment Report (ODAR).

Engineering qualification costs are not in our data.

WA Space Cluster Segments & Companies Affected

Affects Satellite Manufacturing, Propulsion (Aerojet Rocketdyne, Agile Space), and In-Space Servicing (Starfish Space).

Related BC ESG Guides & Verified Primary Sources

Underlying Rule Status & Deciding Instruments (Batch 5)

BC ESG

ESG Strategy, Sustainability Intelligence, and Business Continuity for Forward-Thinking Organizations

© 2026 BC ESG — Business Continuity, ESG & Sustainability Intelligence