# Howard A. Hanson Dam: How $7.8B in December 2025 Damage Was Prevented

- **Site:** bcesg.org
- **Program:** FRAME-300-BCESG — Freight, Rail & the Valley
- **Pillar:** The Valley
- **Evidence Basis:** Agency Figure (Preliminary)
- **Primary Agency / Source:** U.S. Army Corps of Engineers (USACE) Seattle District
- **As-Of / Repair Horizon:** 2026-11-16 (Dec 2025 Preliminary Analysis)
- **2-Page Reference PDF:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-valley-howard-hanson-dam-dec-2025-7-8b.pdf
- **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-valley-howard-hanson-dam-dec-2025-7-8b-infographic.png

> *Figure attributed strictly to USACE Seattle District preliminary analysis (Dec 2025); labeled preliminary per House standard.*

## Summary

A preliminary USACE Seattle District analysis credits Howard A. Hanson Dam with preventing an estimated $7.8B in downstream Green River flood damages during the December 2025 atmospheric rivers (out of $8.7B region-wide).

## Documented Corridor Facts & Continuity Record

- During the December 2025 atmospheric-river storms, USACE Seattle District operated Howard A. Hanson Dam and Mud Mountain Dam to hold back peak flood pulses.
- USACE's preliminary analysis estimates regional Corps flood-risk management prevented ~$8.7B in Puget Sound damages, with Howard A. Hanson Dam alone accounting for ~$7.8B along the Green River.
- Even with Hanson Dam holding back peak flows, downstream levee weak points at Desimone and Pacific still breached—showing that dam storage alone does not eliminate valley levee risk.

## USACE Seattle District Dec 2025 Flood-Damage-Prevented Breakdown

| Asset / Scope | Preliminary Estimate | Source | Caveat |
| --- | --- | --- | --- |
| Howard A. Hanson Dam (Green River) | ~$7.8 billion prevented | USACE Seattle District | Preliminary Dec 2025 analysis |
| All Puget Sound Section 7 Ops | ~$8.7 billion prevented | USACE Seattle District | Includes Mud Mountain Dam |
| Downstream Levee Residual Risk | 2 breaches (Desimone, Pacific) | King County / USACE | Dam cannot prevent local levee failure |

## Operational Exposure & Facility Playbook

- Every Kent, Auburn, Renton, and Tukwila space facility sits downstream of a single federally operated earthfill dam completed in 1962.
- Facilities teams must monitor USACE Seattle District pool elevation and outflow advisories during November–February atmospheric rivers.
- Pair dam-storage awareness with local levee-reach monitoring: Desimone breached even while Hanson Dam operated within design.

## Connected Valley Cities, Segments & Role Briefs

- [WA Space Cluster Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Kent WA Space Cluster Profile](https://bcesg.org/kent-wa-space-cluster-profile/)
- [Auburn WA Space Cluster Profile](https://bcesg.org/auburn-wa-space-cluster-profile/)
- [Tukwila WA Space Cluster Profile](https://bcesg.org/tukwila-wa-space-cluster-profile/)
- [Facilities / EHS Desk Brief](https://bcesg.org/wa-space-role-facilities-ehs-desk-brief/)
- [Propulsion Continuity Exposure](https://bcesg.org/wa-space-propulsion-continuity-exposure/)

## Primary Sources & Agency References

- [USACE Seattle District (DVIDS)](https://www.dvidshub.net/unit/USACE-SD)
- [King County Flood Services](https://kingcounty.gov/en/dept/dnrp/nature-recreation/environment-ecology-conservation/flood-services)