# OMB M-22-18 Blanket Software Self-Attestation: DEAD — Rescinded by OMB M-26-05 (Jan 2026) & EO 14306

> **Rule:** OMB M-22-18 Blanket Federal Software Self-Attestation Mandate (EO 14144 / EO 14306) | **Status:** DEAD | **Instrument:** EO 14306 (June 2025) & OMB Memorandum M-26-05 (Jan 2026) | **Date:** June 2025 / January 2026  
> **Canonical URL:** https://bcesg.org/wa-space-rule-omb-m22-18-attestation-dead/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-omb-m22-18-attestation-dead.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-omb-m22-18-attestation-dead-infographic.png

**Verdict & Proof:** OMB M-22-18's blanket federal software self-attestation mandate is DEAD. EO 14306 (June 2025) rolled back EO 14144's centralized CISA attestation hoops, and OMB M-26-05 (January 2026) formally rescinded M-22-18, replacing it with agency-led risk-based software assurance.

## Mechanism of Death: EO 14306 & OMB M-26-05

In January 2025, EO 14144 sought to tighten EO 14028 by requiring machine-readable third-party software security attestations routed to CISA. In June 2025, EO 14306 rolled back those centralized CISA validation mandates. In January 2026, OMB Memorandum M-26-05 formally rescinded M-22-18.

As a result, Washington mission-software and ground-system vendors no longer face a single blanket OMB M-22-18 self-attestation form for every federal sale.

- OMB M-22-18 and M-23-16 blanket self-attestation regime is rescinded.
- EO 14306 eliminated centralized CISA attestation submission mandates.
- Agency-specific risk-based clauses and NIST SP 800-218 (SSDF) remain active.

| Software Security Instrument | 2025–2026 Action | Current Status |
| --- | --- | --- |
| OMB M-22-18 Blanket Attestation | Rescinded by OMB M-26-05 (Jan 2026) | DEAD |
| EO 14144 Centralized CISA Validation | Rolled back by EO 14306 (June 2025) | DEAD |
| CISA 2026 SBOM Minimum Elements | Expanded to 23 elements | LIVE (Guidance / Contract Spec) |
| NIST SP 800-218 (SSDF) | Retained as baseline engineering standard | LIVE (Reference Standard) |

## What Replaced It: CISA 2026 23-Element SBOM & Agency Risk Terms

OMB M-26-05 shifts federal software assurance to agency-led, risk-based procurement. Meanwhile, CISA published its updated 2026 Minimum Elements for a Software Bill of Materials (expanding from 7 to 23 elements), and DoD/NASA contracts still enforce DFARS 252.204-7012 and mission-critical SBOM deliverables.

## Related BC ESG Guides & Verified Primary Sources

- [Batch 4: EO 14028 SBOM & SSDF Attestation](https://bcesg.org/wa-space-ask-eo-14028-sbom-software-attestation/)
- [DFARS 252.204-7012 & NIST 800-171 (LIVE)](https://bcesg.org/wa-space-rule-dfars-7012-nist-800-171-live/)
- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [OMB Memoranda Archive (White House)](https://www.whitehouse.gov/omb/information-for-agencies/memoranda/)
- [CISA Software Bill of Materials (SBOM)](https://www.cisa.gov/sbom)
