# King County Floodplain & Green River Levee Rules (KCC 21A.24): LIVE — Zero-Rise & 3-Ft Freeboard

> **Rule:** King County Critical Areas Flood Hazard & Green River Levee Rules (KCC Chapter 21A.24) | **Status:** LIVE | **Instrument:** King County Code Chapter 21A.24 (21A.24.230–.270) & Municipal Flood Ordinances | **Date:** Active (Enforced at Every Building/Site Permit)  
> **Canonical URL:** https://bcesg.org/wa-space-rule-king-county-floodplain-levee-live/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-king-county-floodplain-levee-live.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-rule-king-county-floodplain-levee-live-infographic.png

**Verdict & Proof:** King County Code Chapter 21A.24 floodplain and Green River levee-driven land-use rules are LIVE. Valley facilities in Kent and Tukwila face Zero-Rise Floodway prohibitions, Channel Migration Zone setbacks, 3-foot Base Flood Elevation (BFE) freeboard, and 1:1 compensatory flood storage.

## Who Owes What by When: Kent & Tukwila Green River Corridor

The Green River corridor running through Kent and Tukwila hosts major Washington space facilities (including Blue Origin, Stoke Space, Cowboy Space, BlackSky, and Starfish Space). Under KCC 21A.24.230–.270 and coordinated Kent/Tukwila municipal critical-area codes, new structures are barred in FEMA/Zero-Rise Floodways, and Channel Migration Zones (CMZs) restrict bankside expansion.

Permitted construction or substantial improvement in the Flood Fringe requires elevating the lowest floor at least 3 feet above the 100-year Base Flood Elevation (BFE), providing 1:1 compensatory storage for any fill, protecting King County Flood Control District levee access/setbacks, and restricting hazardous material storage.

- Zero-Rise Floodway: 0.0-foot modeled rise in 100-year flood elevation.
- Elevation: +3 feet above Base Flood Elevation (BFE) for new/substantially improved structures.
- Compensatory Storage: any floodplain fill must be offset by equivalent nearby excavation.

| Flood Hazard Rule | Standard | Impact on Valley Space Facilities |
| --- | --- | --- |
| Zero-Rise Floodway | No new structures; 0.0 ft rise | Blocks expansion into active floodway |
| Lowest Floor Elevation | BFE + 3 feet minimum | Drives slab/dock elevation & floodproofing |
| Compensatory Storage | 1:1 volume replacement | Requires detention/excavation for yard fill |
| Hazardous Materials | Restricted in flood hazard areas | Affects propellant, solvent & battery storage |

## Levee-Protected Parcels Are Not Exempt

Even parcels behind Green River levees (Disconnected Migration Areas) frequently remain mapped in FEMA Special Flood Hazard Areas or face levee-setback and overtopping standards.

## Related BC ESG Guides & Verified Primary Sources

- [Washington SEPA (LIVE)](https://bcesg.org/wa-space-rule-wa-sepa-live/)
- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [FEMA Flood Map Service Center](https://www.fema.gov/flood-maps)
- [King County Code Title 21A (KCC 21A.24)](https://aqua.kingcounty.gov/council/clerk/code/24_Title_21A.htm)
