# Quality Manager Duty: AS9100D, AS9102 First Article Inspection & Nadcap Special Processes

> **Role:** Quality Manager | **Top Live Mandate:** AS9100D, AS9102 FAIR & Nadcap Sub-Tier Control | **Dead Rule to Ignore:** FAR 2021-015 Climate Clauses | **Next Date:** Per First-Lot Ship & Nadcap Audit Cycle  
> **Canonical URL:** https://bcesg.org/wa-space-role-quality-as9100-fai-nadcap/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-role-quality-as9100-fai-nadcap.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-role-quality-as9100-fai-nadcap-infographic.png

**Desk Priority:** For WA machining, propulsion, and avionics shops, winning a prime PO depends on AS9100D certification, passing AS9102 FAIRs on first-article hardware, and routing heat-treat, NDT, and brazing only to Nadcap-accredited sources.

## 1. What Arrives on This Desk (Live Asks & Rules)

Across the [17 core Components & Materials suppliers](https://bcesg.org/wa-space-components-materials-segment-overview/) and [Auburn/Kent aerospace precision shops](https://bcesg.org/adjacent-general-aerospace-auburn-kent-group/), three quality gates determine whether a PO can ship: [AS9100D & IA9100](https://bcesg.org/wa-space-ask-as9100d-ia9100-quality-gate/), [AS9102 First Article Inspection](https://bcesg.org/wa-space-ask-as9102-first-article-inspection/), and [Nadcap Special Processes](https://bcesg.org/wa-space-ask-nadcap-special-processes/).

On a 20–500-person team, the Quality Manager verifies that every drawing callout for heat treating, non-destructive testing (NDT), chemical processing, welding, or brazing is routed strictly to a Nadcap-accredited (and prime-approved) sub-tier processor before parts leave the floor.

## 2. What Is Dead or Enjoined and Can Be Ignored

Ignore any vendor-portal prompt suggesting [FAR 2021-015](https://bcesg.org/wa-space-rule-far-case-2021-015-withdrawn/) climate attestations are required for QMS approval.

## 3. What Carries a Date (Deadlines & Instruments)

Governing quality instruments and release triggers:

| Standard | Status | Trigger | Scope |
| --- | --- | --- | --- |
| AS9100D / IA9100 | LIVE | Onboarding & Annual Surveillance | Full QMS & OASIS listing |
| AS9102 Rev C | LIVE | First production lot / Rev change | Forms 1, 2, 3 + ballooned drawing |
| Nadcap (PRI) | LIVE | Special-process PO issuance | NDT, heat treat, welding, coatings |

## 4. Internal Handoffs (Who Hands What to Whom)

Cross-desk handoffs to keep FAIR and Nadcap cycles on schedule:

| Handoff | Action | Receiving Role |
| --- | --- | --- |
| Quality -> Procurement | Approved special-process supplier list (ASL) | [Procurement Lead Desk Brief](https://bcesg.org/wa-space-role-procurement-lead-desk-brief/) |
| Quality -> Program Manager | FAIR completion & Nadcap lead-time alerts | [Program Manager Desk Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/) |
| Quality -> Export Control | ITAR mark & control on Nadcap/FAIR packets | [Export Control: ITAR/EAR Flow-Downs](https://bcesg.org/wa-space-role-export-itar-ear-flowdowns/) |

## Corpus Anchors: Asks, Rules, Segments & Sibling Roles

- [Quality Manager Desk Brief (Overview)](https://bcesg.org/wa-space-role-quality-manager-desk-brief/)
- [AS9100D & IA9100 Quality Gate](https://bcesg.org/wa-space-ask-as9100d-ia9100-quality-gate/)
- [AS9102 First Article Inspection](https://bcesg.org/wa-space-ask-as9102-first-article-inspection/)
- [Nadcap Special Processes](https://bcesg.org/wa-space-ask-nadcap-special-processes/)
- [Components & Materials Special Processes](https://bcesg.org/wa-space-components-materials-special-processes/)
