# Program Manager Duty: FAA Part 450, NEPA Review & FCC/NASA Orbital Debris Gates

> **Role:** Program Manager | **Top Live Mandate:** 14 CFR Part 450, NEPA, 47 CFR 25.283(e) & NPR 8715.6B | **Dead Rule to Ignore:** Legacy FAA Parts 415/417/431/435 (Removed Mar 10, 2026) | **Next Date:** Mar 9, 2026 (Part 450 Mandatory) / Pre-Launch & Pre-CDR  
> **Canonical URL:** https://bcesg.org/wa-space-role-program-faa-nepa-fcc-odar/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-role-program-faa-nepa-fcc-odar.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-role-program-faa-nepa-fcc-odar-infographic.png

**Desk Priority:** Launch and satellite programs in Washington must clear FAA Part 450 (with legacy parts removed Mar 10, 2026), NEPA EA/EIS review, FCC 5-year LEO deorbit, and NASA ODAR casualty limits.

## 1. What Arrives on This Desk (Live Asks & Rules)

WA launch and orbital operators—including [Blue Origin](https://bcesg.org/blue-origin-washington-space-cluster-profile/), [Stoke Space](https://bcesg.org/stoke-space-washington-space-cluster-profile/), [Starfish Space](https://bcesg.org/starfish-space-washington-space-cluster-profile/), [Portal Space Systems](https://bcesg.org/portal-space-systems-washington-space-cluster-profile/), [Gravitics](https://bcesg.org/gravitics-washington-space-cluster-profile/), [BlackSky](https://bcesg.org/blacksky-washington-space-cluster-profile/), and [Starcloud](https://bcesg.org/starcloud-washington-space-cluster-profile/)—face four interlocking mission gates: [FAA Part 450](https://bcesg.org/wa-space-rule-faa-part-450-launch-live/), [NEPA launch licensing](https://bcesg.org/wa-space-rule-nepa-launch-licensing-live/), [FCC 5-year LEO deorbit](https://bcesg.org/wa-space-rule-fcc-5-year-deorbit-live/) (plus [EPD flow-down](https://bcesg.org/wa-space-ask-fcc-5yr-deorbit-epd-flowdown/)), and [NASA ODAR](https://bcesg.org/wa-space-rule-nasa-odar-orbital-debris-live/).

## 2. What Is Dead or Enjoined and Can Be Ignored

Legacy FAA launch Parts 415, 417, 431, and 435 are dead as of March 10, 2026 under [14 CFR Part 450](https://bcesg.org/wa-space-rule-faa-part-450-launch-live/). Do not plan schedules around legacy checklists.

## 3. What Carries a Date (Deadlines & Instruments)

Governing launch and debris instruments:

| Gate | Status | Key Date / Threshold | Instrument |
| --- | --- | --- | --- |
| FAA Part 450 | LIVE | Transition ended Mar 9, 2026 | 14 CFR Part 450 |
| NEPA Review | LIVE | Active (2026 streamlining pending) | 42 U.S.C. § 4321 / Order 1050.1F |
| FCC 5-Yr Deorbit | LIVE | Eff. Sep 9, 2024 / Comp. Sep 29, 2024 | 47 CFR § 25.283(e) |
| NASA ODAR | LIVE | <1:10,000 human casualty risk | NPR 8715.6B / STD-8719.14C |

## 4. Internal Handoffs (Who Hands What to Whom)

Debris and launch-safety gates require early handoffs to Executive, Facilities, and Export Control:

| Handoff | Scope | Target Role |
| --- | --- | --- |
| Program Manager -> CEO | Part 450 / FCC financial responsibility & insurance | [Founder: Prime Contracts & Liability](https://bcesg.org/wa-space-role-founder-prime-contracts-liability/) |
| Program Manager -> Facilities | NEPA & SEPA environmental test-site data | [Facilities: Waste, PSCAA & Floodplain](https://bcesg.org/wa-space-role-facilities-waste-pscaa-floodplain/) |

## Corpus Anchors: Asks, Rules, Segments & Sibling Roles

- [Program Manager Desk Brief (Overview)](https://bcesg.org/wa-space-role-program-manager-desk-brief/)
- [FAA Part 450 Launch Licensing (LIVE)](https://bcesg.org/wa-space-rule-faa-part-450-launch-live/)
- [NEPA Launch Licensing (LIVE)](https://bcesg.org/wa-space-rule-nepa-launch-licensing-live/)
- [FCC 5-Year Deorbit (LIVE)](https://bcesg.org/wa-space-rule-fcc-5-year-deorbit-live/)
- [NASA ODAR Orbital Debris (LIVE)](https://bcesg.org/wa-space-rule-nasa-odar-orbital-debris-live/)
