# WA Clean Buildings (CBPS) & Seattle BEPS Facility Readiness Checklist

*Synthesized from BC ESG anchors #1171 and #1275, Batch 4 (#1891), Batch 5 (#1984–#1999), and Batch 6 (#2064).*

- **Section:** Readiness (Dead-Rule Cleanup & Hygiene)
- **Evidence Basis:** Batch 5/6 WA Building Energy Rules
- **Primary Authority / Source:** WA Dept. of Commerce / Seattle OSE
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-wa-cbps-seattle-beps-audit.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-wa-cbps-seattle-beps-audit-infographic.png)

> Washington space facilities in Kent, Auburn, Renton, Tukwila, Seattle, Redmond, and Bellevue face live state and municipal building-energy mandates under WA CBPS and Seattle BEPS, regardless of federal climate rule withdrawals.

## Readiness Checklist & Corpus Traceability

- **Confirm Building Tier & Lease Split:** Verify gross square footage and NNN tenant metering under [WA CBPS (LIVE)](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/) and [WA CBPS & Seattle BEPS Tenant Data](https://bcesg.org/wa-space-ask-wa-cbps-seattle-beps-tenant-data/).
- **Benchmark in ENERGY STAR Portfolio Manager:** Set up site EUI tracking using [WA Clean Buildings Guide](https://bcesg.org/washington-clean-buildings-performance-standard-cbps-guide/).
- **Track Seattle BEPS 2027 & 2031 Dates:** For Seattle plants, prepare 2027 GHG verification and 2031 GHGI cap planning per [Seattle BEPS (LIVE)](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/) and [Seattle BEPS Guide](https://bcesg.org/seattle-beps-building-emissions-performance-standard-guide/).
- **Separate WA CCA & CFS Costs:** Track utility fuel-cost pass-throughs under [WA Climate Commitment Act (LIVE)](https://bcesg.org/wa-space-rule-wa-climate-commitment-act-live/) and [WA Clean Fuel Standard (LIVE)](https://bcesg.org/wa-space-rule-wa-clean-fuel-standard-live/).

## WA Facility Energy Readiness Checklist

| Mandate | Facility Action | Corpus Source |
| :--- | :--- | :--- |
| WA CBPS Tier 1/2 | EMP, O&M program & Portfolio Manager EUI | [#1984 WA CBPS LIVE](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/) |
| Seattle BEPS | 2027 GHG verification; 2031 GHGI cap prep | [#1987 Seattle BEPS](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/) |
| Tenant Utility Data | Align landlord-tenant submeter data sharing | [#1891 Tenant Data](https://bcesg.org/wa-space-ask-wa-cbps-seattle-beps-tenant-data/) |
| WA CCA & CFS | Log utility/fleet fuel surcharges in Finance | [#1996 WA CCA LIVE](https://bcesg.org/wa-space-rule-wa-climate-commitment-act-live/) |

## Operator Execution & Boundary Notes

- Assign execution to Facilities & EHS ([Facilities: WA CBPS & Seattle BEPS](https://bcesg.org/wa-space-role-facilities-wa-cbps-seattle-beps/)) with landlord coordination for leased industrial bays.
- Industrial cleanrooms and propulsion test bays have high process-load profiles—document process-load exemptions/adjustments early in EMP filings.
- Reuse the same 12-month utility dataset for CA SB 253 customer requests and EcoVadis.

## Connected Corpus Source Pieces

- [WA Clean Buildings (CBPS) LIVE](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/)
- [Seattle BEPS (SMC 22.925) LIVE](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/)
- [WA CBPS Guide (#1171)](https://bcesg.org/washington-clean-buildings-performance-standard-cbps-guide/)
- [Seattle BEPS Guide (#1275)](https://bcesg.org/seattle-beps-building-emissions-performance-standard-guide/)
- [Facilities: WA CBPS & Seattle BEPS](https://bcesg.org/wa-space-role-facilities-wa-cbps-seattle-beps/)

## Primary Authorities & Official Records

- [WA Commerce Clean Buildings](https://www.commerce.wa.gov/building-infrastructure/clean-buildings/)
- [Seattle BEPS (OSE)](https://www.seattle.gov/environment/climate-change/buildings-and-energy/building-emissions-performance-standard)
