# Prime RFP ESG & Disclosure Packet Readiness Checklist (WA Space)

*Synthesized from BC ESG Batch 4 Supplier Asks (#1804–#1885) and Batch 6 Compliance Lead Desk Brief (#2043). No new regulatory claims added.*

- **Section:** Readiness (Supplier-Ask & Audit Readiness)
- **Evidence Basis:** Batch 4 Supplier Asks & Batch 6 Role Synthesis
- **Primary Authority / Source:** Boeing / Amazon Leo / EcoVadis / CDP
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-prime-rfp-disclosure-packet.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-prime-rfp-disclosure-packet-infographic.png)

> A single reusable RFP disclosure packet lets a 20–500-person Washington space supplier answer Boeing, Amazon Leo, L3Harris, Lockheed, Northrop, and EcoVadis/CDP portal asks without inventing responses for primes that publish no standalone ESG code.

## Readiness Checklist & Corpus Traceability

- **Boeing Supplier Code of Conduct:** Map ethics, environmental, and labor attestations to [Boeing Supplier Code of Conduct](https://bcesg.org/wa-space-ask-boeing-supplier-code-of-conduct/) before bid submission.
- **Amazon Leo Supply Chain Standards:** Prepare Redmond/constellation vendor onboarding evidence per [Amazon Leo Supplier Standards](https://bcesg.org/wa-space-ask-amazon-leo-supplier-standards/).
- **L3Harris, Lockheed & Northrop Codes:** Cross-check prime ethics/environmental flow-downs against [L3Harris, Lockheed & Northrop Codes](https://bcesg.org/wa-space-ask-l3harris-lockheed-northrop-codes/).
- **SpaceX & Blue Origin Boundary:** Confirm no standalone supplier ESG code is required when bidding SpaceX Redmond or Blue Origin Kent per [SpaceX & Blue Origin: No ESG Code](https://bcesg.org/wa-space-ask-spacex-blue-origin-no-esg-code/).
- **EcoVadis, CDP & Prime Portals:** Maintain one master evidence folder for [EcoVadis & IAEG](https://bcesg.org/wa-space-ask-ecovadis-iaeg-assessment/), [CDP Supply Chain](https://bcesg.org/wa-space-ask-cdp-supply-chain-invitations/), and [Prime Onboarding Portals](https://bcesg.org/wa-space-ask-prime-supplier-onboarding-portals/).

## Prime RFP Packet Readiness Matrix (Traced to Corpus)

| Ask / Exposure | Required Evidence | Corpus Source |
| :--- | :--- | :--- |
| Boeing Supplier Code | Signed ethics, EHS & labor flow-down attestation | [#1873 Boeing Code](https://bcesg.org/wa-space-ask-boeing-supplier-code-of-conduct/) |
| Amazon Leo Standards | Supply chain compliance & facility utility records | [#1879 Amazon Leo](https://bcesg.org/wa-space-ask-amazon-leo-supplier-standards/) |
| SpaceX / Blue Origin | Quality/ITAR/safety only; no standalone ESG code | [#1876 No ESG Code](https://bcesg.org/wa-space-ask-spacex-blue-origin-no-esg-code/) |
| EcoVadis / CDP | Annual questionnaire + Scope 1+2 energy baseline | [#1804 EcoVadis](https://bcesg.org/wa-space-ask-ecovadis-iaeg-assessment/) |
| CA Customer SB 253 | Facility Scope 1+2 data (Scope 3 partial posture) | [#1813 SB 253 Asks](https://bcesg.org/wa-space-ask-sb-253-scope-1-2-ca-customers/) |

## Operator Execution & Boundary Notes

- Assign packet ownership to the Compliance Lead ([Compliance Lead Desk Brief](https://bcesg.org/wa-space-role-compliance-lead-desk-brief/)) with utility inputs from Facilities/EHS.
- Do not fabricate Scope 3 product-level carbon factors where primes have not requested them; cite [Scope 3 Job-Level Carbon Data](https://bcesg.org/wa-space-ask-scope-3-job-level-carbon-data/) and [CA SB 253 Scope 3 Partial](https://bcesg.org/wa-space-rule-ca-sb-253-scope-3-partial/).
- Refresh the master packet annually after WA utility bills close and before Q1/Q2 prime portal renewals.

## Connected Corpus Source Pieces

- [Boeing Supplier Code of Conduct](https://bcesg.org/wa-space-ask-boeing-supplier-code-of-conduct/)
- [SpaceX & Blue Origin: No ESG Code](https://bcesg.org/wa-space-ask-spacex-blue-origin-no-esg-code/)
- [Amazon Leo Supplier Standards](https://bcesg.org/wa-space-ask-amazon-leo-supplier-standards/)
- [Prime Supplier Onboarding Portals](https://bcesg.org/wa-space-ask-prime-supplier-onboarding-portals/)
- [Compliance Lead Desk Brief](https://bcesg.org/wa-space-role-compliance-lead-desk-brief/)

## Primary Authorities & Official Records

- [Boeing Suppliers Portal](https://www.boeingsuppliers.com/)
- [Amazon Leo](https://www.aboutamazon.com/what-we-do/devices-services/amazon-leo)
- [EcoVadis](https://www.ecovadis.com/)
- [CDP](https://www.cdp.net/en)
