# Dated Compliance & Infrastructure Calendar (Nov 2026 – 2031)

*All dates match BC ESG Batches 4, 5, 7, 8, and 9 verbatim. EO 26-04 carries no deadline.*

- **Section:** Readiness (Role Paths & Dated Calendar)
- **Evidence Basis:** Batch 4/5/7/8/9 Corpus Dates
- **Primary Authority / Source:** CARB / WA Commerce / Seattle OSE / FAA / KCFCD
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-dated-calendar-2026-2031.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-dated-calendar-2026-2031-infographic.png)

> A master dated calendar consolidating every verified deadline and infrastructure horizon from Batches 1–9: FAA Part 450 (Mar 9, 2026), CA SB 253 Scope 1+2 (Nov 10, 2026 anchor), WA CBPS (2026–2028), Seattle BEPS (2027/2031), SR 167 (2029–2030), Desimone Levee (2031), and annual October floodplain audits.

## Readiness Checklist & Corpus Traceability

- **2026 Anchors:** FAA Part 450 transition completed `Mar 9, 2026` ([FAA Part 450](https://bcesg.org/wa-space-rule-faa-part-450-launch-live/)); CA SB 253 Scope 1+2 first-report anchor `Nov 10, 2026` ([CA SB 253 Scope 1+2](https://bcesg.org/wa-space-rule-ca-sb-253-scope-1-2-live/)); annual `October` Valley flood audit ([Annual Audit](https://bcesg.org/wa-space-playbook-annual-valley-corridor-continuity-audit/)).
- **2026–2028 State & Local Cycles:** WA CBPS Tier 1/Tier 2 compliance cycles ([WA CBPS LIVE](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/)); Starfish `Otter` 2026–2027 roadmap ([Starfish Otter](https://bcesg.org/wa-space-orbital-starfish-space-otter-servicing/)).
- **2027 Milestones:** Seattle BEPS GHG verification ([Seattle BEPS LIVE](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/)); CA SB 253 Scope 3 statutory target (`PARTIAL` — subject to 9th Cir. Jan 9, 2026 posture per [SB 253 Scope 3 Partial](https://bcesg.org/wa-space-rule-ca-sb-253-scope-3-partial/)).
- **2029–2031 Infrastructure & Caps:** SR 167 Completion Project `2029–2030` ([SR 167 Completion](https://bcesg.org/wa-space-corridor-sr-167-completion-port-tacoma/)); Desimone Levee repair horizon `2031` ([Levee 2026-2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/)) and Seattle BEPS GHGI caps `2031`.

## Master Dated Calendar (2026–2031)

| Date / Window | Milestone & Posture | Corpus Source |
| :--- | :--- | :--- |
| Mar 9, 2026 | FAA Part 450 launch transition completed (LIVE) | [#1966 FAA 450](https://bcesg.org/wa-space-rule-faa-part-450-launch-live/) |
| Annual (Oct) | Green River Valley flood & corridor audit | [#2221 Oct Audit](https://bcesg.org/wa-space-playbook-annual-valley-corridor-continuity-audit/) |
| Nov 10, 2026 | CA SB 253 Scope 1+2 first-report anchor (LIVE) | [#1957 SB 253](https://bcesg.org/wa-space-rule-ca-sb-253-scope-1-2-live/) |
| 2026–2028 | WA CBPS Tier 1 & Tier 2 compliance cycles (LIVE) | [#1984 WA CBPS](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/) |
| 2027 | Seattle BEPS GHG verif. + SB 253 Scope 3 (PARTIAL) | [#1987 BEPS](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/) |
| 2029–2030 | WSDOT SR 167 Completion Project window | [#2143 SR 167](https://bcesg.org/wa-space-corridor-sr-167-completion-port-tacoma/) |
| 2031 | Desimone Levee repair horizon & BEPS GHGI caps | [#2137 Levee 2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/) |

## Operator Execution & Boundary Notes

- Note that EO 26-04 (Washington Space Council) has **no statutory first-report deadline** ([EO 26-04 Council](https://bcesg.org/wa-space-fight-washington-space-council-eo-26-04/)) and is omitted from hard compliance deadlines.
- FCC `47 CFR § 25.283(e)` 5-year LEO disposal is already live (effective Sept 9, 2024; compliance Sept 29, 2024) and runs per-mission from End-of-Mission (EOM).
- Re-verify CA SB 253 Scope 3 and Council developments quarterly as court and legislative dockets advance.

## Connected Corpus Source Pieces

- [CA SB 253 Scope 1+2 (LIVE)](https://bcesg.org/wa-space-rule-ca-sb-253-scope-1-2-live/)
- [CA SB 253 Scope 3 (PARTIAL)](https://bcesg.org/wa-space-rule-ca-sb-253-scope-3-partial/)
- [WA Clean Buildings (CBPS) LIVE](https://bcesg.org/wa-space-rule-wa-cbps-clean-buildings-live/)
- [Seattle BEPS (SMC 22.925) LIVE](https://bcesg.org/wa-space-rule-seattle-beps-smc-22-925-live/)
- [Levee Repair Timeline 2026-2031](https://bcesg.org/wa-space-valley-levee-repair-timeline-2026-2031/)

## Primary Authorities & Official Records

- [WA Commerce Clean Buildings](https://www.commerce.wa.gov/building-infrastructure/clean-buildings/)
- [Seattle BEPS (OSE)](https://www.seattle.gov/environment/climate-change/buildings-and-energy/building-emissions-performance-standard)
- [WSDOT Puget Sound Gateway](https://wsdot.wa.gov/construction-planning/major-projects/puget-sound-gateway-program)
