# 90-Day Readiness Path: Quality, Facilities/EHS & Program Manager

*Synthesized from BC ESG Batch 6 (#2034–#2040, #2061–#2067, #2079–#2085), Batch 5 (#2008), Batch 7, and Batch 9.*

- **Section:** Readiness (Role Paths & Dated Calendar)
- **Evidence Basis:** Batch 6 Role Briefs & Batch 7/9 Synthesis
- **Primary Authority / Source:** BC ESG Role Synthesis (#2034, #2061, #2079)
- **As-Of / Horizon:** 2026-11-16
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-90-day-engineering-quality-ehs-path.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-readiness-90-day-engineering-quality-ehs-path-infographic.png)

> A sequenced 30/60/90-day operational readiness path for Quality Managers, Facilities/EHS Leads, and Program Managers across AS9100D/Nadcap, WA CBPS/Seattle BEPS, Green River Valley flood readiness, and FCC/FAA/ODAR licensing.

## Readiness Checklist & Corpus Traceability

- **Days 1–30 (Quality Manager):** Audit OASIS/AS9100D status, AS9102 FAIR templates, Nadcap certs, and AS5553 traceability per [Quality Manager Desk Brief](https://bcesg.org/wa-space-role-quality-manager-desk-brief/) and [Quality: AS9100, FAI & Nadcap](https://bcesg.org/wa-space-role-quality-as9100-fai-nadcap/).
- **Days 1–30 (Facilities / EHS):** Benchmark building EUI for [WA CBPS & Seattle BEPS](https://bcesg.org/wa-space-role-facilities-wa-cbps-seattle-beps/) and verify Valley flood/waste permits per [Facilities: Waste, PSCAA & Floodplain](https://bcesg.org/wa-space-role-facilities-waste-pscaa-floodplain/).
- **Days 31–60 (Program Manager):** Lock [FAA, NEPA, FCC & ODAR](https://bcesg.org/wa-space-role-program-faa-nepa-fcc-odar/) gates into mission PDR/CDR schedules.
- **Days 61–90 (Joint Execution):** Rehearse [72-Hour Valley Flood Playbook](https://bcesg.org/wa-space-playbook-72-hour-valley-flood-levee-breach/) and [NFS Subcontracting Schedule](https://bcesg.org/wa-space-role-program-nfs-subcontracting-schedule/) handoffs.

## 30/60/90-Day Quality, EHS & Program Manager Checklist

| Window | Owner & Deliverable | Corpus Source |
| :--- | :--- | :--- |
| Days 1–30 | Quality: AS9100D, FAIR & Nadcap gap check | [#2034 Quality Brief](https://bcesg.org/wa-space-role-quality-manager-desk-brief/) |
| Days 1–30 | EHS: WA CBPS/BEPS & Ecology/PSCAA audit | [#2061 EHS Brief](https://bcesg.org/wa-space-role-facilities-ehs-desk-brief/) |
| Days 31–60 | PM: FCC 5-yr, ODAR & FAA Part 450 gates | [#2079 Program Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/) |
| Days 61–90 | EHS/PM: Valley flood & OSOW transit drill | [#2221 Oct Audit](https://bcesg.org/wa-space-playbook-annual-valley-corridor-continuity-audit/) |

## Operator Execution & Boundary Notes

- Ensure EHS coordinates [WA Ecology Dangerous Waste & Propellant](https://bcesg.org/wa-space-ask-wa-ecology-dangerous-waste-propellant/) and [WA Ecology Waste & PSCAA (LIVE)](https://bcesg.org/wa-space-rule-wa-ecology-waste-pscaa-live/) permits before test-stand firing.
- Keep [NASA-STD-8739 Workmanship](https://bcesg.org/wa-space-ask-nasa-std-8739-workmanship/) operator certifications current for flight-harness builds.
- Log annual October floodplain checks ahead of November–January Green River atmospheric-river season.

## Connected Corpus Source Pieces

- [Quality Manager Desk Brief](https://bcesg.org/wa-space-role-quality-manager-desk-brief/)
- [Facilities & EHS Desk Brief](https://bcesg.org/wa-space-role-facilities-ehs-desk-brief/)
- [Program Manager Desk Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/)
- [WA Ecology Waste & PSCAA (LIVE)](https://bcesg.org/wa-space-rule-wa-ecology-waste-pscaa-live/)
- [Program: FAA, NEPA, FCC & ODAR](https://bcesg.org/wa-space-role-program-faa-nepa-fcc-odar/)

## Primary Authorities & Official Records

- [WA Commerce Clean Buildings](https://www.commerce.wa.gov/building-infrastructure/clean-buildings/)
- [47 CFR 25.283 (eCFR)](https://www.ecfr.gov/current/title-47/chapter-I/subchapter-B/part-25/subpart-D/section-25.283)
