# Prime Schedule-Slip & Force-Majeure Documentation Playbook During Corridor Closures

- **Site:** bcesg.org
- **Program:** FRAME-300-BCESG — Freight, Rail & the Valley
- **Pillar:** Closure Playbook
- **Evidence Basis:** Operational Playbook + Contract Governance
- **Primary Agency / Source:** Program Management & Finance Governance
- **As-Of / Repair Horizon:** 2026-11-16
- **2-Page Reference PDF:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-playbook-prime-schedule-slip-force-majeure.pdf
- **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-playbook-prime-schedule-slip-force-majeure-infographic.png

> *Contract governance playbook; legal counsel should review specific prime flow-down clauses.*

## Summary

How Program Managers and Finance Leads document dated levee breaches, WSDOT highway closures, and pass bans to protect prime contract milestones and business-interruption insurance claims.

## Documented Corridor Facts & Continuity Record

- Prime aerospace subcontracts typically require written excusable-delay / force-majeure notice within 24 to 72 hours of a qualifying disruption.
- Attach primary dated agency receipts: King County evacuation orders, WSDOT SR 167/I-90 closure bulletins, or USACE dam advisories—never modeled planning scenarios.
- Track extra expedite freight, overtime, and idle-cell hours in a dedicated cost code for Contingent Business Interruption (CBI) or ingress/egress insurance claims.

## Force-Majeure & Insurance Evidence Pack

| Claim / Notice Type | Required Primary Receipt | Owner |
| --- | --- | --- |
| Excusable Schedule Delay | Dated WSDOT closure / KC evacuation order | Program Manager (#2079) |
| Ingress / Egress Insurance | Timestamped road-block proof + lost-hour log | Finance Lead (#2100) |
| Customer Recovery Plan | Pre-vetted detour / air-diversion schedule | Supply-Chain (#2052) |

## Operational Exposure & Facility Playbook

- Never wait until a missed delivery date to notify a prime buyer; send a factual early-warning notice the day SR 167 or I-90 closes.
- Verify whether your property policy includes 'Ingress/Egress' and 'Civil Authority' coverage for levee evacuations without physical water entry.
- Keep all dated WSDOT/King County screenshots in a single WO/incident folder.

## Connected Valley Cities, Segments & Role Briefs

- [WA Space Cluster Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Program Manager Desk Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/)
- [Finance: CCA, CBAM & Insurance](https://bcesg.org/wa-space-role-finance-cca-cbam-insurance/)
- [Supply-Chain & Procurement Desk Brief](https://bcesg.org/wa-space-role-procurement-lead-desk-brief/)
- [Launch Segment Continuity Exposure](https://bcesg.org/wa-space-launch-continuity-corridor-exposure/)

## Primary Sources & Agency References

- [King County Flood Services](https://kingcounty.gov/en/dept/dnrp/nature-recreation/environment-ecology-conservation/flood-services)
- [WSDOT Real-Time Mountain Passes](https://wsdot.com/travel/real-time/mountainpasses)
- [WA EMD Regional Plans (Recovery Annex)](https://mil.wa.gov/plans)
