# Annual Green River Valley Corridor & Floodplain Continuity Audit Checklist

- **Site:** bcesg.org
- **Program:** FRAME-300-BCESG — Freight, Rail & the Valley
- **Pillar:** Closure Playbook
- **Evidence Basis:** Operational Playbook (Annual Audit)
- **Primary Agency / Source:** BC ESG Facilities / EHS & Supply-Chain
- **As-Of / Repair Horizon:** 2026-11-16 (Run Annually Each October)
- **2-Page Reference PDF:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-playbook-annual-valley-corridor-continuity-audit.pdf
- **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-playbook-annual-valley-corridor-continuity-audit-infographic.png

> *Synthesizes Batch 7 valley, corridor, hardware, and playbook controls into one annual pre-winter checklist.*

## Summary

A 10-point annual October audit for Kent, Auburn, Renton, and Tukwila space facilities—verifying levee repair status toward 2031, generator fuel, KCC 21A.24 elevation, OSOW curfews, and upland staging.

## Documented Corridor Facts & Continuity Record

- Run this 10-point continuity audit every October before the November–February Pacific Northwest atmospheric-river season.
- 1–3 (Valley & Facility): Check King County Desimone (2031 horizon) and Pacific levee updates; verify Elevation Certificates (+3 ft BFE); load-test generators and top off 72-hour diesel.
- 4–7 (Corridors & Hardware): Confirm WSDOT SR 167 Gateway construction detours; refresh 49 CFR hazmat alternate routes; validate ITAR-compliant upland staging yards; review 15–30d rail alloy buffers.
- 8–10 (Diversion & Governance): Confirm SEA/BFI Known Shipper status; test force-majeure notice templates; verify Ingress/Egress & flood insurance sublimits.

## Annual October Valley Continuity Audit Scorecard

| # | Audit Item | Owner | Pass Criterion |
| --- | --- | --- | --- |
| 1 | Levee & Dam Status Check | Facilities / EHS | Reviewed KC DNRP & USACE updates |
| 2 | Generator & 72h Fuel Autonomy | Facilities / EHS | Load-tested; >=72h fuel contract |
| 3 | KCC 21A.24 & Hazmat Elevation | Facilities / EHS | Drums & switchgear > BFE + 3ft |
| 4 | Upland Staging & Air Diversion | Supply-Chain | Active SEA/BFI broker + gated yard |
| 5 | Insurance & Prime Notice Pack | Finance / PM | CBI/Ingress limits & 24h template |

## Operational Exposure & Facility Playbook

- Store signed October audit scorecards alongside AS9100D business-continuity / risk-management records (Clause 6.1).
- Re-run a mini-check whenever King County issues a Flood Phase 2 alert.
- Link this checklist directly to Facilities/EHS (#2061, #2067) and Program Manager (#2079) desk briefs.

## Connected Valley Cities, Segments & Role Briefs

- [WA Space Cluster Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Facilities / EHS Desk Brief](https://bcesg.org/wa-space-role-facilities-ehs-desk-brief/)
- [Facilities: Waste, PSCAA & Floodplain](https://bcesg.org/wa-space-role-facilities-waste-pscaa-floodplain/)
- [Supply-Chain & Procurement Desk Brief](https://bcesg.org/wa-space-role-procurement-lead-desk-brief/)
- [Program Manager Desk Brief](https://bcesg.org/wa-space-role-program-manager-desk-brief/)
- [Finance: CCA, CBAM & Insurance](https://bcesg.org/wa-space-role-finance-cca-cbam-insurance/)

## Primary Sources & Agency References

- [King County Flood Services](https://kingcounty.gov/en/dept/dnrp/nature-recreation/environment-ecology-conservation/flood-services)
- [WSDOT Puget Sound Gateway / SR 167](https://wsdot.wa.gov/construction-planning/major-projects/puget-sound-gateway-program)
- [USACE Seattle District (DVIDS)](https://www.dvidshub.net/unit/USACE-SD)