# NASA ODAR & EOMP Practice (NASA-STD-8719.14C): Contract Deliverable vs. Regulation

*Primary-source check against NASA-STD-8719.14 and NPR 8715.6B as of 2026-11-16; distinct from Batch 5 status verdict #1963.*

- **Section:** Orbital Sustainability (Disposal Regime)
- **Evidence Basis:** Agency Technical Standard (Contract Deliverable)
- **Primary Authority / Source:** NASA ODPO / Standards
- **As-Of / Horizon:** NASA-STD-8719.14C & NPR 8715.6B (Active Nov 2026)
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-nasa-odar-contract-deliverable.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-nasa-odar-contract-deliverable-infographic.png)

> Unlike FCC 47 CFR § 25.283(e), NASA-STD-8719.14C and NPR 8715.6B are not federal regulations—they are agency technical standards enforced as binding contract deliverables (ODAR and EOMP) on NASA missions and rideshare payloads.

## Documented Instrument & Engineering Record

- Contract vs. regulation: NASA-STD-8719.14C binds missions through NASA procurement contracts, Space Act Agreements, and launch-integration requirements—not general civil rulemaking.
- Two required documents: The Orbital Debris Assessment Report (ODAR) is submitted at Preliminary Design Review (PDR) and updated at Critical Design Review (CDR) / Flight Readiness Review (FRR), paired with an End of Mission Plan (EOMP).
- Standard analytical tools: Mission teams run NASA's Debris Assessment Software (DAS) for orbital lifetime and collision probability, and ORSAT (Object Reentry Survival Analysis Tool) when DAS flags casualty risk near or above 1:10,000.
- Angle split with Batch 5: Batch 5 Post #1963 confirms NASA ODAR is LIVE; this brief specifies the PDR/CDR deliverable workflow and DAS/ORSAT engineering inputs.

## NASA ODAR Deliverable Milestones & Software Gates

| Milestone / Artifact | Requirement Source | Technical Deliverable |
| :--- | :--- | :--- |
| Preliminary ODAR | NPR 8715.6B / PDR | Initial orbital lifetime, passivation & casualty estimate |
| Final ODAR | NPR 8715.6B / CDR-FRR | Verified DAS/ORSAT run with as-built component masses |
| End of Mission Plan (EOMP) | NASA-STD-8719.14C | Step-by-step passivation, venting & deorbit execution |
| Reentry Casualty Gate | Requirement 4.7-1 | Total Ec < 0.0001 (1:10,000) across >15 J fragments |
| Explosion Probability Gate | Requirement 4.4-1 | Accidental explosion probability < 0.001 |

## Mission Designer, Compliance Lead & Founder Takeaways

- WA suppliers building payloads or hosted instruments for NASA missions must supply material/mass breakdowns (titanium, stainless steel, reaction wheels) for ORSAT survivability runs.
- Contract deliverables cannot be waived by commercial licensing alone; NASA Safety and Mission Assurance (SMA) signs off separately from FCC.
- Program managers should freeze ODAR component lists before CDR to avoid late-stage demisability redesigns.

## Connected Census Profiles, Segments & Rules

- [Batch 5 Verdict: NASA ODAR Standard (LIVE)](https://bcesg.org/wa-space-rule-nasa-odar-orbital-debris-live/)
- [Program Manager Role: FAA, NEPA, FCC & ODAR](https://bcesg.org/wa-space-role-program-faa-nepa-fcc-odar/)
- [WA Space Cluster Hub](https://bcesg.org/washington-space-cluster-census/)

## Primary Sources & Official Records

- [NASA Standards: NASA-STD-8719.14](https://standards.nasa.gov/standard/nasa/nasa-std-871914)
- [NASA NODIS: NPR 8715.6B (Limiting Orbital Debris)](https://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=8715&s=6B)
- [NASA ODPO: Orbital Debris Mitigation](https://orbitaldebris.jsc.nasa.gov/mitigation/)