# FCC 5-Year Post-Mission Disposal Rule (47 CFR § 25.283(e)): Mechanics & Spacecraft Requirements

*Primary-source check against 47 CFR § 25.283(e) (eCFR) as of 2026-11-16; distinct from Batch 5 status verdict #1960.*

- **Section:** Orbital Sustainability (Disposal Regime)
- **Evidence Basis:** Federal Regulation (47 CFR § 25.283(e))
- **Primary Authority / Source:** FCC Space Bureau / eCFR
- **As-Of / Horizon:** Effective Sept 9, 2024; Compliance Sept 29, 2024
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-fcc-5-year-rule-mechanics.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-orbital-fcc-5-year-rule-mechanics-infographic.png)

> Under 47 CFR § 25.283(e), space stations ending missions in or passing through Low Earth Orbit below 2,000 km must complete atmospheric reentry as soon as practicable and no later than 5 years after end of mission—replacing the legacy 25-year guideline.

## Documented Instrument & Engineering Record

- Altitude scope: Applies to all U.S.-licensed satellites (Part 25) and non-U.S. satellites seeking U.S. market access whose missions end in or pass through LEO below 2,000 km.
- End-of-mission (EOM) trigger: For spacecraft with propulsion and collision avoidance, EOM occurs when the satellite can no longer conduct collision-avoidance maneuvers; for non-maneuverable spacecraft, EOM is completion of the primary mission.
- Grandfathering boundary: Satellites already in orbit prior to the September 29, 2024 compliance date (and certain grandfathered authorizations) remain under prior license terms unless modified.
- Angle split with Batch 5: Batch 5 Post #1960 establishes that the rule is LIVE; this brief details the engineering triggers, EOM definition, and waiver/licensing mechanics required of mission designers.

## 47 CFR § 25.283(e) Instrument Parameters

| Parameter | Instrument Requirement | Engineering Impact |
| :--- | :--- | :--- |
| Altitude Scope | LEO region below 2,000 km | Covers nearly all WA constellation & EO orbits |
| Disposal Deadline | As soon as practicable; <= 5 years post-EOM | Forces propulsion or <=500 km deployment |
| EOM Trigger (Propulsive) | Loss of collision-avoidance capability | Requires reserved EOL propellant before depletion |
| EOM Trigger (Non-Propulsive) | Completion of primary mission | Passive drag must decay orbit within 5 years |
| Jurisdictional Reach | U.S. Part 25 + non-U.S. market access | Binds foreign operators serving U.S. customers |

## Mission Designer, Compliance Lead & Founder Takeaways

- Mission designers cannot treat 5 years as a passive-drag guarantee above ~500–600 km; solar-cycle minima can push unpropelled decay past 5 years.
- Compliance leads must align FCC Orbital Debris Mitigation Plan (ODMP) disclosures with propellant-reserve telemetry and EOM triggers.
- WA constellation operators (SpaceX Redmond, Amazon Leo, BlackSky) and servicing providers (Starfish Space) design directly around this 5-year ceiling.

## Connected Census Profiles, Segments & Rules

- [Batch 5 Verdict: FCC 5-Year Deorbit Rule (LIVE)](https://bcesg.org/wa-space-rule-fcc-5-year-deorbit-live/)
- [WA Space Cluster Hub](https://bcesg.org/washington-space-cluster-census/)
- [Amazon Leo (Redmond) Census Profile](https://bcesg.org/amazon-leo-washington-space-cluster-profile/)
- [SpaceX Redmond Census Profile](https://bcesg.org/spacex-redmond-washington-space-cluster-profile/)

## Primary Sources & Official Records

- [eCFR: 47 CFR § 25.283 (Space Station End-of-Life Disposal)](https://www.ecfr.gov/current/title-47/chapter-I/subchapter-B/part-25/subpart-D/section-25.283)
- [NASA ODPO: Orbital Debris Mitigation Overview](https://orbitaldebris.jsc.nasa.gov/mitigation/)
