# Alabama & Huntsville’s Blue Origin Package: >$50M Performance Incentives for BE-4 Engine Manufacturing

*Sourced from City of Huntsville, Madison County, and Alabama Dept. of Commerce (Made in Alabama) records (2017–2020).*

- **Section:** The State Fight (Competitor States)
- **Evidence Basis:** Huntsville / AL Commerce 2017–2020 Record
- **Primary Authority / Source:** AL Dept. of Commerce / City of Huntsville
- **As-Of / Horizon:** 2017–2020 Execution (verified Nov 2026)
- **Reference PDF:** [Download 2-Page PDF](https://bcesg.org/wp-content/uploads/2026/11/wa-space-fight-alabama-blue-origin-huntsville.pdf)
- **Infographic:** [View Infographic](https://bcesg.org/wp-content/uploads/2026/11/wa-space-fight-alabama-blue-origin-huntsville-infographic.png)

> Between 2017 and 2020, Alabama, the City of Huntsville, and Madison County assembled a performance-based incentive package valued at over $50 million—contingent on ULA's BE-4 contract, $200M in capital investment, and 300–342 jobs—to anchor Blue Origin's BE-4 engine factory in Huntsville while Kent remained corporate HQ.

## Documented Policy & Site-Selection Record

- Project & Location: Announced in June 2017 and opened in early 2020, Blue Origin invested ~$200M in a Huntsville Cummings Research Park factory to build BE-4 engines for New Glenn and ULA's Vulcan Centaur.
- Incentive Structure: The Alabama Dept. of Commerce, City of Huntsville, and Madison County approved a >$50M performance-based package of tax abatements, incentives, and infrastructure reimbursements.
- Contract & Performance Contingencies: Full execution was conditioned on ULA selecting the BE-4 engine (completed Sept 2018) and meeting 300–342 job-creation and capex milestones.
- Ecosystem & Testing Pull: Huntsville paired incentives with NASA Marshall Space Flight Center's Test Stand 4670 refurbishment and proximity to ULA's Decatur rocket plant—while Blue Origin kept its headquarters in Kent, WA.

## Huntsville BE-4 Engine Factory Deal Terms (2017–2020)

| Element | Documented Figure / Condition | Source |
| :--- | :--- | :--- |
| State & Local Package | >$50M in tax abatements, incentives & reimbursements | Huntsville / Madison County (July 2017) |
| Capital Investment | $200M factory in Cummings Research Park | Alabama Dept. of Commerce |
| Jobs & Wages | 300–342 high-tech jobs (~$75,000 avg wage cited) | Made in Alabama / GeekWire |
| Execution Gate | Contingent on ULA BE-4 selection (Sept 2018) | Huntsville City Council Record |

## Founder, Staffer & Site-Selector Takeaways

- Founder Takeaway: Alabama's model pairs >$50M performance abatements with existing federal NASA test-stand infrastructure and prime customer proximity.
- Counter-Record Check: Blue Origin's Huntsville plant is a documented multi-state expansion for propulsion manufacturing—not an HQ exit from Kent, Washington.

## Connected Census Profiles, Segments & Valley Corridors

- [WA Space Cluster Hub (#1382)](https://bcesg.org/washington-space-cluster-census/)
- [Blue Origin WA Profile](https://bcesg.org/blue-origin-washington-space-cluster-profile/)
- [Kent WA Space Cluster Profile](https://bcesg.org/kent-wa-space-cluster-profile/)
- [WA Space Launch Segment Overview](https://bcesg.org/wa-space-launch-segment-overview/)

## Primary Sources & Official Records

- [Alabama Department of Commerce (Made in Alabama)](https://www.madeinalabama.com/)
- [City of Huntsville Economic Development](https://www.huntsvilleal.gov/)
- [GeekWire Aerospace Coverage](https://www.geekwire.com/)
