# EPA TSCA Section 8(a)(7) PFAS (40 CFR Part 705) Supplier Inquiries

> **Canonical URL:** https://bcesg.org/wa-space-ask-tsca-pfas-part-705/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-tsca-pfas-part-705.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-tsca-pfas-part-705-infographic.png

**Sourced Baseline:** Binding US federal law (40 CFR Part 705) for entities that manufactured or imported PFAS (including PFAS-containing articles like PTFE seals/wiring) between 2011 and 2022. EPA shifted the submission window start to January 31, 2027. Purely domestic purchasers are not direct filers, but receive upstream prime questionnaires.

## Who Issues This Ask, Authority, and Binding Status

PFAS supplier questionnaires come from aerospace primes and Tier-1 integrators preparing their own **US EPA TSCA Section 8(a)(7)** (`40 CFR Part 705`) filings—or screening BOMs for fluoropolymers (PTFE/Teflon seals, Viton O-rings, fluorosilicone, wire insulation, and AFFF/coatings).

Statutorily, `40 CFR Part 705` is **binding US federal law** on any entity that *manufactured* or *imported* PFAS (including PFAS inside imported articles) for commercial purposes between **January 1, 2011 and December 31, 2022**. EPA subsequently pushed the official submission period start to **January 31, 2027** (or 60 days after a forthcoming final rule). If a WA shop bought domestic PTFE seals from a US distributor and never imported parts directly, it is **not a statutory Part 705 filer**, though primes may still ask for PFAS presence under contractual material-disclosure terms.

| Role in Supply Chain | Statutory Duty under 40 CFR Part 705 | Expected Evidence |
| --- | --- | --- |
| Imported PFAS or PFAS-containing parts (2011–2022) | Binding EPA CDX filing (window starts Jan 31, 2027) | CDX submission + 5-yr recordkeeping |
| Domestic-only buyer/machinist of US-made PTFE | No direct EPA Part 705 filing duty | Prime PFAS attestation / AD-DSL if PO-required |
| Scope 3 / GHG Emissions | Not part of TSCA Part 705 | None |

## Evidence Required & Small-Supplier Effort Cost

Direct importers file electronically via EPA's CDX (Central Data Exchange) under the 'known to or reasonably ascertainable by' standard; domestic sub-tier suppliers respond to prime surveys with a **PFAS Presence/Absence Attestation** or IPC-1754 / AD-DSL declaration.

Exact small-supplier administrative and CDX-prep hours are **not in our data**.

## WA Space Cluster Segments & Companies Affected

PFAS inquiries land squarely on [Components & Suppliers](https://bcesg.org/wa-space-components-materials-disclosure-compliance/) and [Propulsion](https://bcesg.org/wa-space-propulsion-disclosure-compliance/)—including cryogenic valve makers like [Space Valves](https://bcesg.org/space-valves-puyallup-washington-space-cluster-profile/) (PTFE/PCTFE valve seats), [PacAero](https://bcesg.org/pacaero-wenatchee-sequim-washington-space-cluster-profile/), [Karman Space & Defense](https://bcesg.org/karman-space-defense-systima-mukilteo-washington-space-cluster-profile/), and [Aerojet Rocketdyne](https://bcesg.org/aerojet-rocketdyne-l3harris-washington-space-cluster-profile/).

## Related BC ESG Guides & Verified Primary Sources

- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [Components & Materials Compliance](https://bcesg.org/wa-space-components-materials-disclosure-compliance/)
- [Propulsion Compliance](https://bcesg.org/wa-space-propulsion-disclosure-compliance/)
- [Space Valves (Puyallup) Profile](https://bcesg.org/space-valves-puyallup-washington-space-cluster-profile/)
- [eCFR — 40 CFR Part 705 (TSCA Section 8(a)(7) PFAS)](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-R/part-705)
- [US EPA — TSCA Section 8(a)(7) Reporting & Recordkeeping](https://www.epa.gov/assessing-and-managing-chemicals-under-tsca/tsca-section-8a7-reporting-and-recordkeeping)