# NASA FAR Supplement (NFS) Supplier Flow-Downs & Safety/Mishap Rules

> **Canonical URL:** https://bcesg.org/wa-space-ask-nasa-far-supplement-nfs-clauses/  
> **Published:** 2026-11-16 · **Program:** FRAME-300-BCESG · **PDF Brief:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-nasa-far-supplement-nfs-clauses.pdf  
> **Infographic:** https://bcesg.org/wp-content/uploads/2026/11/wa-space-ask-nasa-far-supplement-nfs-clauses-infographic.png

**Sourced Baseline:** Binding NASA federal clauses (48 CFR Chapter 18 / Part 1852), including NFS 1852.223-70 (Safety and Occupational Health) and hardware quality/mishap reporting. Carries zero GHG/Scope 3 mandate after the Jan 2025 withdrawal of FAR Case 2021-015.

## Who Issues This Ask, Authority, and Binding Status

NASA prime contractors—such as [Blue Origin](https://bcesg.org/blue-origin-washington-space-cluster-profile/), [Aerojet Rocketdyne](https://bcesg.org/aerojet-rocketdyne-l3harris-washington-space-cluster-profile/), [Gravitics](https://bcesg.org/gravitics-marysville-washington-space-cluster-profile/), [Starfish Space](https://bcesg.org/starfish-space-tukwila-washington-space-cluster-profile/), and [Planet Enterprises](https://bcesg.org/gig-harbor-wa-space-software-mission-services-census-group/)—flow down **NASA FAR Supplement (NFS) Part 1852** clauses on civil-space subcontracts.

**Binding status:** `48 CFR Chapter 18 (Part 1852)` clauses are **binding federal acquisition regulations** when incorporated into a NASA prime contract and flowed down. Dead-rule boundary: NASA was a joint signatory to the **January 13, 2025 withdrawal of FAR Case 2021-015 (`90 FR 2663`)**; NFS clauses do **not** impose Scope 1/2/3 GHG or SBTi mandates.

| NFS Clause | Scope | Supplier Action |
| --- | --- | --- |
| NFS 1852.223-70 | Safety and Occupational Health | Maintain safety plan + report mishaps |
| NFS 1852.246-70+ | Mission Assurance / Quality | Flow down NASA-STD-8739 & inspection logs |
| FAR 2021-015 (Withdrawn) | Climate / GHG | None — withdrawn Jan 13, 2025 |

## Evidence Required & Small-Supplier Effort Cost

Under `NFS 1852.223-70`, suppliers maintain a **Safety and Health Plan** (aligned with OSHA / WA L&I DOSH rules), report qualifying mishaps or close calls immediately to the prime, and meet invoked `NASA-STD` hardware quality clauses.

Exact compliance costs are **not in our data**.

## WA Space Cluster Segments & Companies Affected

Lands on civil-space primes and subcontractors in [Launch](https://bcesg.org/wa-space-launch-disclosure-compliance-surface/), [In-Space Servicing](https://bcesg.org/wa-in-space-servicing-disclosure-compliance/), [Propulsion](https://bcesg.org/wa-space-propulsion-disclosure-compliance/), and [Components & Suppliers](https://bcesg.org/wa-space-components-materials-disclosure-compliance/).

## Related BC ESG Guides & Verified Primary Sources

- [WA Space Cluster Census Hub](https://bcesg.org/washington-space-cluster-census/)
- [The Dead FAR Climate Rule (Jan 2025)](https://bcesg.org/wa-space-ask-far-climate-rule-withdrawal/)
- [NASA-STD-8739 Workmanship](https://bcesg.org/wa-space-ask-nasa-std-8739-workmanship/)
- [eCFR — 48 CFR Part 1852 (NASA FAR Supplement Clauses)](https://www.ecfr.gov/current/title-48/chapter-18/subchapter-H/part-1852)
- [eCFR — NFS 1852.223-70 (Safety and Occupational Health)](https://www.ecfr.gov/current/title-48/chapter-18/subchapter-H/part-1852/subpart-1852.2/section-1852.223-70)
